Skip to content

Residential, commercial and industrial design

Basement being lowered around a brick pier

Basement apartments · Secondary suites

Legal basement apartments in Toronto, designed to meet the Building Code.

A secondary suite lives or dies on six things: ceiling height, a way out, bedroom windows, alarms, the separation between the units and the zoning. We check all six, design the suite around them, then file one coordinated permit set.

Does this sound like my house?

Most basement apartment projects start with one of these.

If one sounds like yours, say so in your request, and Rocco starts from there.
  • Your basement has 6'6" ceilings and you want to know whether a legal secondary suite is possible without lowering the floor.
  • You already rent the basement, informally, and want it legal before the next tenant or the next inspection.
  • You are buying a bungalow listed with an “in-law suite” and need to know what it takes to make it a permitted secondary suite.
  • The basement has a walkout, but the only way out of the suite runs through your kitchen.
  • A contractor said “you don't need a permit for a basement” and you want a straight answer before the drywall goes up.

Can my basement become a legal secondary suite?

Check your basement. See what the design must fix.

Eight questions about the basement as it stands: house type, ceiling height, the way out, bedroom windows, alarms, fuel-burning appliances or an attached garage, the floor between the units, and the kitchen and bathroom. Each answer is checked against a City of Toronto source, and the checklist fills in as you go. What comes out is the list Rocco prices.

Your answers can go with your request.

Skip the basement check
0 of 8 answeredJump to the full result
  1. Checked against Zoning By-law 569-2013, Chapter 150.10 Secondary Suite (opens in a new tab), s. 150.10.40.40.

What the design must fix

Answer the eight questions; the checklist fills in as you go.

0 of 8 answered

What a legal suite needs

  • Not answered yet: Zoning
  • Not answered yet: Ceiling height
  • Not answered yet: Way out
  • Not answered yet: Bedroom windows
  • Not answered yet: Smoke alarms
  • Not answered yet: CO alarms
  • Not answered yet: Floor between the units
  • Not answered yet: Kitchen and bathroom
  • In hand
  • The design solves it
  • We check it on site

A self-check against City of Toronto sources, not a permit review. The Ontario Building Code sets window sizes, fire ratings and alarm details; the City pages do not publish those numbers, so neither do we. Rocco confirms every item on site.

Sources (6)

What will it take?

What the City requires for a basement apartment, and what we design.

The City's rules in plain English, each linked to its toronto.ca source, then every sheet in the set and each step from start to finish.

In short

  • Written zoning review of your basement, Code items included, before any drawing starts
  • Site plan, floor plans, sections, details, HVAC and forms from one office
  • Our fee quoted in writing; City fees listed separately, up front
New underpinned basement wall sections poured in numbered stages

Zoning By-law 569-2013 permits a secondary suite in a detached house, semi-detached house or townhouse, one per dwelling unit (s. 150.10.20.1, By-law 549-2019). In apartment, commercial-residential and institutional zones (RA, RAC, CL, CR, I and similar) it is allowed only inside a lawfully existing house of those three types. A secondary suite is self-contained living accommodation with its own food preparation and sanitary facilities, located in and subordinate to a dwelling unit.

toronto.ca · Zoning By-law 569-2013, Chapter 150.10 Secondary Suite (opens in a new tab)

What does it cost?

Design and permit fees for a basement apartment: the City's, and ours.

The City's bill, ours and the engineer's, kept apart. The City's fees follow its published 2026 schedules and are paid when each application is filed. Ours is quoted in writing; an engineer's or consultant's fee, where one is needed, is quoted on its own.

Paid to the City of Toronto

Building permit, City fee
$11.53/m²
2026 rate for interior alterations, minimum $214.79, paid to the City. Example: a 70 m² suite is $807.10, plus the $56.33 unit fee below ($863.43 in all).
New residential unit, City fee
$56.33
Charged once for the new dwelling unit in the application (2026).
Underpinning, City fee
$12.37/linear m
Only if the floor is lowered (2026 rate). The engineer's design and site reviews are quoted separately.

Paid to Architalcan

Zoning review
Included
Written review of the zoning and Code items for your basement, with your quote.
Design and permit set, our fee
In writing
Quoted after the zoning review: site plan, floor plans, sections, details, HVAC and forms.

Who will draw it?

Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

Rated 5.0 from 273 reviews on HomeStars.
Rocco Schipano holding the HomeStars Best of the Best 2023 award

Professional and reliable

Architalcan Design was professional, kept us informed, and the final result exceeded our expectations. Our basement is now the perfect living space.

Customer · Aug 15, 2024
Read all 273 on HomeStars (opens in a new tab)
Registration
BCIN 25897 – 41741 Look up the BCIN
Classes
House · Small Buildings · Large Buildings · HVAC-House
On the drawings
The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
About Rocco and the firm

How do I start?

Get a written quote for your basement apartment.

Send the address, and add the ceiling height under “Anything else?” on the last step. Rocco reads the zoning and the Code items and replies in writing with what the design must fix and a quote.

Step 2 of 3 · Property

Project:Basement apartments

Where is the property?
Do you have a property survey?

A survey lets us confirm setbacks and buildable area from the start. No survey? We'll tell you how to get one.

BCIN registered · Insured · 20+ years in Toronto

Questions before you send it

Do I need a building permit for a basement apartment in Toronto?

Yes. Toronto Building issues a building permit for an interior alteration that adds a second dwelling unit to a detached house, semi or townhouse; its guide names the basement apartment as the common example. The application needs a site plan referenced to your survey with a zoning summary, fully dimensioned floor plans of every level showing smoke and CO alarm locations and plumbing fixtures, sections with floor-to-ceiling heights and stair details, construction details, the Application to Construct or Demolish, Schedule 1 Designer Information and the Rental Renovation Licence Screening Form, all as PDFs through Toronto Building's online Application Submission Tool. Building without a permit adds 50% of the permit fee or $214.79, whichever is greater, up to $29,456.99.

Is a secondary suite allowed in my zone?

Across Toronto's residential zones, yes, as-of-right (allowed without a rezoning or minor variance): By-law 569-2013 permits one secondary suite per dwelling unit in a detached house, semi-detached house or townhouse (Chapter 150.10, By-law 549-2019). In the apartment, commercial, commercial-residential and institutional zones (RA, RAC, CL, CR, I and others) the suite must sit inside a lawfully existing house of one of those three types. The suite is capped at 45% of the dwelling unit's interior floor area, except in a one-storey detached house, where it may take the whole basement. No parking space is required for it. The zoning review with your quote confirms your zone and the area split.

How high does my basement ceiling need to be?

Toronto's Property Standards by-law sets 1.95 m over at least half the floor area as the minimum for a habitable room, and bars any basement from use as a dwelling unit unless every habitable room meets the rules for ceiling height, a way out (egress), light and ventilation (Chapter 629, § 629-4 and § 629-25). Measure to the underside of the joists, then under the beams and ducts, which often set the real number. Below 1.95 m the floor is lowered and the footings underpinned: a Professional Engineer designs and reviews the work where the new footing sits below a neighbour's footing within the soil's angle of repose (close enough to it that digging could undermine it), and the City requires engineer testing at the first and last stages in every case. The City's underpinning fee is $12.37 per linear metre (2026). The Building Code's own rules for the renovation are applied in the permit review; we design to both.

Does the apartment need its own entrance?

It needs its own way out to ground level. Toronto Fire Services lists three exit problems it finds in two-unit houses: no dedicated exterior door leading directly to ground level, a shared route through the other unit, and an exit that does not lead directly outdoors. A new below-grade entrance is a permit item in its own right: the City's basement-entrance guide asks for a site plan with setbacks, foundation plans with the underpinning stages numbered and the distance to the neighbour's footings, and sections showing the grade height above the basement floor and the landing at the base of the stair. Where the new footing goes below an adjacent footing within the angle of repose, a Professional Engineer designs it. We draw the entrance, the stair, guards and handrails, and coordinate the engineer.

What smoke and CO alarms does a legal basement apartment need?

Toronto Building requires the floor plans to show the location of every smoke alarm and CO alarm, and Toronto Fire Services names the lack of interconnected alarms throughout the house as a risk factor in two-unit homes, so the set lays out interconnected alarms on both levels. For CO: in a house with two units an alarm is required in a suite with a fuel-burning appliance or fireplace, in one that sits above, below or beside a service room with such an appliance or beside a garage, and, since January 1, 2026, in one heated by air from a fuel-burning appliance elsewhere in the house. They go adjacent to each sleeping area and, since January 1, 2026, on every storey of the suite, plus one in the service room itself. Hardwired, battery and plug-in units are all permitted under the Fire Code.

What does the City charge for a basement apartment permit?

Toronto Building's 2026 rate for interior alterations is $11.53 per m² of altered floor area, plus a residential unit fee of $56.33 for the new unit, with a minimum permit fee of $214.79 for any work. A 70 m² suite is $807.10 plus $56.33, or $863.43 in all. Underpinning, if the floor is lowered, is $12.37 per linear metre. Plumbing and HVAC permits are applied for alongside and charged separately. All of this is paid to the City at submission and is separate from our fee.

The basement is rented now. What changes?

Two things. The permit application includes the City's Rental Renovation Licence Screening Form, which checks whether the City's rental renovation licence by-law (Chapter 662) applies. Since July 31, 2025, a landlord who serves an N13 notice (the Ontario form that ends a tenancy for renovations) because the work needs the unit vacant must hold a Rental Renovation Licence for that unit: apply within seven days of the notice with the building permit already issued, pay $728 per unit (2026), post the City's Tenant Information Notice on the door, and provide either comparable temporary housing or rent-gap payments, plus a $1,500 or $2,500 moving allowance. Work that can be done without an N13 needs no licence. The building permit comes first, which is the order the by-law requires.

Who prepares and signs the basement apartment drawings?

Architalcan's office prepares the drawings, and they are signed under BCIN 25897 – 41741 (House, Small Buildings, Large Buildings, HVAC-House). Toronto Building requires drawings prepared by a qualified designer to carry the designer's name, registration number, qualification number, signature and a statement accepting responsibility for the design; ours do. Sheets that need an engineer carry the engineer's seal; underpinning or structural sheets sealed by a Professional Engineer are filed with the Assumption of Responsibility for Engineering Content form and, where the City requires field review, the Commitment to General Reviews.