Skip to content

Residential, commercial and industrial design

Stock photo of an empty, stripped-back commercial floor with a concrete floor, bare columns, exposed ceiling pipes and a single window

Commercial · Change of use

Change of use in Toronto. The new use planned and drawn for permit.

When an office becomes a shop or an industrial unit becomes a showroom, Toronto Building asks for a permit even if nothing is built. We check the zoning, the Building Code and whether you need an architect, then design the space and draw it for the permit.

In four numbers

A Zoning Use Review: the City confirms whether your use is allowed at the address, without drawings.toronto.ca (opens in a new tab)
$214.79
The City's minimum for a change-of-use permit with nothing built, then $92.79 an hour (2026).toronto.ca (opens in a new tab)
$297.41
The whole building. Past it, or past 3 storeys, alterations that come with the change need an architect; an industrial building, an architect or engineer.ontario.ca (opens in a new tab)
600 m²
People a restaurant may hold for an OAA Licensed Technologist to design it, in a building of up to 3 storeys and 600 m².ontario.ca (opens in a new tab)
100

Does this sound like my property?

A change of use usually starts with one of these.

If one sounds like yours, say so in your request, and Rocco starts from there.
  • Stock photo of a one-storey red-brick commercial building with three tall steel-framed windows and a white garage door

    A new tenant, a new use

    Your new tenant's business is a different kind of use from the last one's, such as an office moving into a former shop.

  • Stock photo of a showroom with white display plinths, architectural models under glass and planters along the windows

    Industrial to showroom or offices

    You own an industrial unit and the next occupant wants it as a showroom, a shop or offices, and you need to know whether the building's size means an architect must design the change.

  • Stock photo of an empty café with wooden tables and yellow chairs around a concrete column, under an exposed industrial ceiling

    A restaurant, gym or place of worship

    A tenant wants to open a restaurant, gym or place of worship in your plaza or industrial building, and you want the zoning answer first; the building work itself is usually designed by an architect (or, for a small restaurant, an OAA Licensed Technologist).

  • Stock photo of a vacant commercial unit with bare concrete walls, pipes and ducts overhead and a lone office chair

    Before you buy or lease

    You are about to buy or lease a building and want to know whether your use is allowed there before you sign.

Does my project need an architect?

It depends on the size and use of the whole building.

Ontario's Architects Act sets the line at 3 storeys and 600 m², counting every floor above ground of the whole building after the work, not just your unit.
Stock photo of a one-storey brick office building with dark windows beside its parking lot

No architect needed

We design it

  • A building of up to 3 storeys and 600 m², used for offices, services or shops.
  • Interior work in a building of any size, when it leaves the structure, fire separations, exits, the main entrance and outside walls alone, and adds no floor space.
Stock photo of a five-storey office building in dark brick and glass above a landscaped entrance

Past the line

An architect designs it

  • A building of more than 3 storeys or 600 m².
  • A restaurant or bar, beyond the interior work. For up to 100 people, in a building within the line, an OAA Licensed Technologist may design it instead.

Not sure which side yours is on? We check it from the survey before any drawing starts.

Ask us to checkArchitects Act, s. 11 (opens in a new tab)

What will it take?

What the City requires when a space changes use, and what we draw.

The rules in plain English, each linked to its source, then every sheet in the set and each step from start to finish.

In short

  • Whether the new use is allowed, checked against your address's zoning first
  • Where the law needs an architect or engineer, you hear it before anything is drawn
  • Our fee quoted in writing; the City's fees listed separately
Stock photo of a large empty commercial unit with taped drywall walls and ceiling, a steel beam and a roll-up door

The Building Code Act, s. 10, requires a permit to change the use of a building or part of one, even when no construction is proposed, if the change would increase the hazard as the Building Code measures it. Toronto Building (the City's permit office) puts it more broadly: “Even if no construction is proposed, if a change of use is proposed a building permit is required.”

ontario.ca · Building Code Act, 1992, s. 10(1) (e-Laws) (opens in a new tab)

Who designs which part?

One permit set, with the right designer on every part.

On a commercial or industrial building, the Building Code and the Architects Act decide who may design each part. We draw the building where the law allows it, then fold the engineers' drawings into one set the City reviews together.
  • Stock photo of a pencil sketch of a building on paper, with markers and tape on a wooden deskOur part

    The building

    Layout, walls, exits, fire separations and the outside of the building

    Designed byArchitalcan, BCIN-registered, while the whole building stays within 3 storeys and 600 m² with no restaurant in it. Past that, an architect.

  • Stock photo of red steel beams and columns of a building frame against a pale sky

    Structure

    Beams, columns, footings, slabs and any new opening in a wall

    Designed byA professional engineer, or a designer registered in Building Structural.

  • Stock photo of a rooftop heating and cooling unit and two small condensers on a flat roof with a ladder and patches of snow

    Heating, cooling and ventilation

    Rooftop units, ductwork, exhaust and energy efficiency

    Designed byA professional engineer, or a designer registered in Building Services. Architalcan's HVAC class covers houses only.

  • Stock photo of red sprinkler pipes hung beneath the dark roof of a building under construction

    Sprinklers and fire alarm

    Sprinkler piping, alarm and detection

    Designed byEngineers, or designers registered for that work: Fire Protection; Detection, Lighting and Power.

  • Stock photo of two copper water pipes running up inside an opened wall

    Plumbing

    Washrooms, drains and water supply

    Designed byAn engineer, or a designer registered in Plumbing – All Buildings.

  • Stock photo of an electrical room lined with switchgear cabinets on both sides of a narrow aisle

    Lighting and power

    Lighting, emergency power and the electrical service

    Designed byAn engineer, or a designer registered for that work.

What does it cost?

Design and permit fees for a change of use: the City's, and ours.

The City's bill, ours and the engineer's, kept apart. The City's fees follow its published 2026 schedules and are paid when each application is filed. Ours is quoted in writing; an engineer's or consultant's fee, where one is needed, is quoted on its own.

Paid to the City of Toronto

Change of use permit, City fee
$92.79/hr
2026 rate per hour of intake, review and inspection for a change of use with no construction (By-law 247-2026, Sch. 8 item 109). Toronto Building's fees page lists it as a $297.41 minimum per permit plus $92.79 for each additional hour.
Alterations with the change, City fee
$12.45/m²
2026 interior alteration rate for Groups A, B and D (assembly; care, treatment and detention; offices and personal services), per m² of the space receiving the work; $11.53/m² for Groups C, E and F (residential, shops and industrial). Minimum $214.79. When the change comes with alterations, this building permit covers it.
Zoning Use Review, City fee
$214.79
2026, per request, no plans needed. Confirms whether the use is permitted at the address; it does not check parking, loading or the use's conditions.
Zoning Applicable Law Certificate, City fee
$888.14
2026, for work on a building other than a house: $888.14 up to 300 m², $1,863.82 over 300 m². Up to three reviews; credited against the permit fee when the permit application is filed with it and the City's Declaration Form – Use of Zoning Applicable Law Certificate.

Paid to Architalcan

Design and permit drawings, our fee
In writing
Quoted in writing for your project. Fees of any engineers the new use needs are quoted on their own.

Who will draw it?

Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

Where the law requires an architect or engineer, they design and seal that work. Rated 5.0 from 273 reviews on HomeStars.
Rocco Schipano holding the HomeStars Best of the Best 2023 award

Renovation of a semi in Toronto

Rocco was efficient and effective. He worked closely with us to ensure the design meets our needs and recommended valuable solutions that we previously weren't aware of. We got the permit within a reasonable amount of time despite submitting it just before the holidays.

HomeOwner · Jan 17, 2025
Read all 273 on HomeStars (opens in a new tab)
Registration
BCIN 25897 – 41741 Look up the BCIN
Classes
House · Small Buildings · Large Buildings · HVAC-House
On the drawings
The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
About Rocco and the firm

How do I start?

Get a written quote for your change of use.

Send the address, what the space is used for now and what it will be, and roughly how big the building is and how many storeys it has. Rocco replies in writing with what the change needs and a quote for the drawings.

Step 2 of 3 · Property

Project:Commercial

Where is the property?
Do you have a property survey?

A survey lets us confirm setbacks and buildable area from the start. No survey? We'll tell you how to get one.

BCIN registered · Insured · 20+ years in Toronto

Questions before you send it

Do I need a permit if nothing is being built?

Toronto Building says yes: a permit is required for a change of use even when no construction is proposed. The Building Code Act ties it to the hazard: section 10 requires the permit chiefly where the Code's change-of-use table marks the change “Yes”. Some changes are marked “No”, such as a low- or medium-hazard industrial unit becoming an office when the whole unit changes; because the City's guidance is broader, confirm with Toronto Building before relying on that. If the change comes with alterations, their building permit covers it.

Do I need an architect for a change of use?

It depends on the new use and on the whole building, not your unit. A building of up to three storeys and 600 m² gross area used only for business, personal services, shops, industry or homes is outside the architect requirement (Architects Act, s. 11(3)(a)), so we can design the change itself: the layout, exits, washroom layout and fire separations. Any structural check, fire alarm, sprinkler, ventilation or plumbing change in such a building is designed by an engineer or a designer registered for that work, and an industrial building designed to house an engineered process or equipment needs an engineer (Professional Engineers Act, s. 12(4)). Building work for an assembly use, or in a business or shop building over 600 m² or three storeys, needs an architect and an engineer (or, for a restaurant for up to 100 people in a building within those limits, an OAA Licensed Technologist). An industrial building over those limits needs an architect or an engineer, or both where another use in it takes up more than 600 m². In a bigger building, or for an assembly use, a non-architect may still design interior work that does not affect, and is not likely to affect, the structure, fire separations, fire safety systems, an exit to the outside, the main entrance, public corridors or exterior walls, and adds no floor space by a mezzanine, infill or similar element (s. 11(3)(e)), but a change of use often has to touch those.

A tenant wants to open a restaurant. What does that take?

More than a shop does. The Architects Act counts eating and drinking as an assembly use, so the design of the building work comes from an architect or, for a restaurant for up to 100 people in a building of up to three storeys and 600 m², an OAA Licensed Technologist (the holder of a limited licence from the Ontario Association of Architects), with an engineer for the engineering, apart from interior-only work that s. 11(3)(e) allows. Under Part 3, the Building Code lets a restaurant designed for 30 people or fewer be classed with shops (Group E), but that does not change the Architects Act. The zoning must allow an eating establishment: in the CR (commercial residential) zone it is a use permitted with conditions, and in the E (employment) zone all eating establishments on a lot are capped at 500 m². Some business licences, eating and drinking establishments among them, start with the City's zoning review for business licence ($248.67 in 2026). Where the restaurant brings alterations or a new major occupancy, the City recommends the Zoning Applicable Law Certificate instead, because it leads to a complete permit application.

How do I find out whether the new use is allowed at my address?

Toronto Building's Zoning Use Review answers that for $214.79 (2026), with no plans needed, for uses such as office, personal services, commercial, restaurant and manufacturing. It does not look at parking, loading, built form or the conditions attached to the use, and drive-throughs, patios and recycling uses need the full Zoning Applicable Law Certificate instead. If the use is not permitted, the usual routes are a minor variance from the Committee of Adjustment (Planning Act, s. 45) or a rezoning (s. 34). Where the building's present use was lawful before the by-law banned it and has carried on since, the Committee can also permit a similar or more compatible use (s. 45(2)).

Does a change of use need site plan approval?

Not when the zoning already permits the new use and the altered part is no more than 1,000 m²: interior alterations that convert all or part of a building to a permitted use are exempt (Municipal Code § 415-45.3), and an industrial-to-industrial conversion must also leave out uses such as recycling, salvage or concrete batching, and any use the zoning permits only with conditions. The exemption is lost if the conversion includes a place of assembly, place of worship, entertainment place of assembly, drive-through or transportation use. Site plan approval (the City's separate review of a property's layout) is still required where the road must be widened. The City can also require it to protect neighbouring land, for health, safety, accessibility or entrance-access reasons, or within 300 m of a rail line or 120 m of a wetland, lake, shoreline or river valley (§ 415-45.5).

Will the City charge development charges?

Not on existing non-residential floor area converted to another non-residential use without demolition, provided the old use was legally established (Municipal Code § 415-7). The City's overview lists interior alterations that result in a change of use among the projects that may pay, and this conversion rule is what exempts a non-residential change. A change to residential use follows different rules. This is the City's current by-law (1137-2022), which runs to August 2027 unless replaced, and it is up to the owner to show the City that the old use was legal (§ 415-7 C(5) and D).

Can a change of use go through the City's Express service?

No. Toronto's Express Services stream takes small commercial interior alterations only where there is no change in use and no change in patron area (the part customers use), so a change of use is not eligible.

Who signs the drawings?

Drawings within our scope are signed under BCIN 25897 – 41741, with the firm's registration number, the designer's name and qualification number, a signature and a statement taking responsibility for the design, as Toronto Building requires. Where the law requires an architect or engineer, they design and seal that work and sign the Commitment to General Reviews (the form in which they agree to review the work on site).