Commercial · Change of use
Change of use in Toronto. The new use planned and drawn for permit.
When an office becomes a shop or an industrial unit becomes a showroom, Toronto Building asks for a permit even if nothing is built. We check the zoning, the Building Code and whether you need an architect, then design the space and draw it for the permit.
In four numbers
- A Zoning Use Review: the City confirms whether your use is allowed at the address, without drawings.toronto.ca (opens in a new tab)
- $214.79
- The City's minimum for a change-of-use permit with nothing built, then $92.79 an hour (2026).toronto.ca (opens in a new tab)
- $297.41
- The whole building. Past it, or past 3 storeys, alterations that come with the change need an architect; an industrial building, an architect or engineer.ontario.ca (opens in a new tab)
- 600 m²
- People a restaurant may hold for an OAA Licensed Technologist to design it, in a building of up to 3 storeys and 600 m².ontario.ca (opens in a new tab)
- 100
Does this sound like my property?
A change of use usually starts with one of these.

A new tenant, a new use
Your new tenant's business is a different kind of use from the last one's, such as an office moving into a former shop.

Industrial to showroom or offices
You own an industrial unit and the next occupant wants it as a showroom, a shop or offices, and you need to know whether the building's size means an architect must design the change.

A restaurant, gym or place of worship
A tenant wants to open a restaurant, gym or place of worship in your plaza or industrial building, and you want the zoning answer first; the building work itself is usually designed by an architect (or, for a small restaurant, an OAA Licensed Technologist).

Before you buy or lease
You are about to buy or lease a building and want to know whether your use is allowed there before you sign.
Does my project need an architect?
It depends on the size and use of the whole building.

No architect needed
We design it
- A building of up to 3 storeys and 600 m², used for offices, services or shops.
- Interior work in a building of any size, when it leaves the structure, fire separations, exits, the main entrance and outside walls alone, and adds no floor space.

Past the line
An architect designs it
- A building of more than 3 storeys or 600 m².
- A restaurant or bar, beyond the interior work. For up to 100 people, in a building within the line, an OAA Licensed Technologist may design it instead.
Not sure which side yours is on? We check it from the survey before any drawing starts.
Ask us to checkArchitects Act, s. 11 (opens in a new tab)What will it take?
What the City requires when a space changes use, and what we draw.
In short
- Whether the new use is allowed, checked against your address's zoning first
- Where the law needs an architect or engineer, you hear it before anything is drawn
- Our fee quoted in writing; the City's fees listed separately

The Building Code Act, s. 10, requires a permit to change the use of a building or part of one, even when no construction is proposed, if the change would increase the hazard as the Building Code measures it. Toronto Building (the City's permit office) puts it more broadly: “Even if no construction is proposed, if a change of use is proposed a building permit is required.”
ontario.ca · Building Code Act, 1992, s. 10(1) (e-Laws) (opens in a new tab)The Building Code sorts uses into major occupancies (its classes of use): offices and personal services (Group D), shops (Group E), industrial uses graded by hazard (Group F), and assembly, places where people gather to eat, drink, worship or meet (Group A). Table 1.3.1.4 marks office to shop, shop to office and industrial to shop “Yes”, as it does any change from an office, shop or industrial unit to an assembly use. Where the change comes with alterations that have a building permit, no separate change-of-use permit is needed.
ontario.ca · Ontario Building Code, Division C, Article 1.3.1.4 and Table 1.3.1.4 (2024 compendium) (opens in a new tab)Where the use changes with no construction, Part 10 (the Code's change-of-use chapter) makes the new use meet a list of today's requirements, including plumbing facilities and ventilation, and the building's performance level may not drop. Among other things, it drops if the floors or roof cannot carry the new use's loads (unless the floor is restricted and posted), if exits, exit signs, emergency lighting or the fire alarm fall short of what the new use needs, if the new use's hazard rating is higher than both the old use's and the rating of the building's construction, or if it is not fire-separated from the occupancies next to it. Where the change comes with alterations under a building permit, the same kind of test is in Part 11 (Renovation), Articles 11.4.2.3 and 11.4.3.4, for buildings at least five years old, or in Section 3.18 or 9.41.
ontario.ca · Ontario Building Code, Division B, Part 10 Change of Use (2024 compendium) (opens in a new tab)Under Zoning By-law 569-2013 a use is permitted only if it is on the zone's list of permitted uses, or on its list of uses permitted with conditions and the conditions are met. A use that is not listed is not allowed, and a listed use cannot be read as covering another one. Site-specific exceptions (Chapter 900) and lots still under a former by-law change the answer address by address.
toronto.ca · Zoning By-law 569-2013, s. 1.20.2(13)–(15) (opens in a new tab)In an existing building the lawful number of parking spaces cannot be reduced when the use changes (s. 200.5.10.11(3)). For offices, shops, restaurants and industrial uses the by-law now sets only a maximum number of spaces, so none are required other than accessible parking (s. 200.5.10.1(7)); any spaces it does require must be provided or approved by a minor variance, a small exception granted by the Committee of Adjustment. Loading depends on the use and its floor area: none for a shop, restaurant or office under 500 m², none for manufacturing or a warehouse under 100 m² (s. 220.5.10.1). A non-residential building changing to another non-residential use needs no extra loading spaces if its first storey covers at least 75% of the lot and the existing spaces stay (s. 220.5.10.11).
toronto.ca · Zoning By-law 569-2013, Chapter 200 Parking (loading: Chapter 220, ss. 220.5.10.1 and 220.5.10.11) (opens in a new tab)A designer who is not an architect may design the construction or alteration of a building of up to three storeys and 600 m² gross area (all floors above ground, measured to the outside of the exterior walls, or to the centre line of a firewall that no access opening or building service passes through, after the work) used only for residential, business, personal services, shop or industrial uses (Architects Act, s. 11(3)(a)). The test is the whole building, or the part of it inside such a firewall, not your unit. Assembly is not on that list. Where a change to a restaurant, place of worship or other gathering use involves construction or alteration, the design comes from an architect, with an engineer for the engineering (s. 11(4)), unless it is interior-only work that s. 11(3)(e) allows. The exception is a restaurant for up to 100 people in a building of up to three storeys and 600 m², which an OAA Licensed Technologist may also design (Reg. 27, s. 32.1). The same architect-and-engineer rule applies to work in a business or shop building over 600 m² or three storeys. An industrial building over those limits needs an architect or an engineer, unless another use in it takes up more than 600 m², in which case it needs both (s. 11(4), rules 2 and 3).
ontario.ca · Architects Act, R.S.O. 1990, c. A.26, s. 11 (e-Laws) (opens in a new tab)Property lines and lot area from a current survey, the building and its setbacks, the permitted and proposed zoning for the new use, every parking and loading space, barrier-free parking and ramps, the fire route and hydrants.
Each level dimensioned and labelled with the current and proposed use of every part of the building, as Toronto's by-law asks of a change-of-use application, with plumbing fixtures, fire separations and the structure above.
Details of the wall, floor and roof assemblies with the fire-resistance ratings and the floor loads the new use requires, as Toronto's by-law asks of a change-of-use application. Whether an existing floor can carry those loads is checked by an engineer or a designer registered for structural work.
An Ontario Building Code matrix or the City's Building Design Information form: the old and new major occupancy, occupant load, exits, fire separations and the life safety systems the new use needs, with the City's Existing Life Safety System form.
Where walls, exits or washrooms change: cross sections with floor-to-floor heights, fire separations and stairs, wall and roof details, and door and room finish schedules.
Where the new use needs the floor strengthened, the fire alarm or sprinklers changed, or new ventilation or plumbing, engineers or designers registered for that work design it, and their drawings go in with ours as one set.
The permit application stating the existing and proposed use, Schedule 1 designer information and, where an architect or engineer is required, their Commitment to General Reviews.
- Use check for the address
From the address we read the zone, any site-specific exception and the conditions attached to the new use, then check the parking limits and loading spaces for it. If the use is not permitted, you hear that first, with the routes, usually a minor variance or a rezoning.
- Code and size check
We class the old and new uses under the Building Code, check whether the change needs a permit on its own, and measure the building's storeys and gross area against the Architects Act. If an architect or engineer is required, you are told before any drawing starts.
- The space drawn as it is, then planned for the new use
From the survey and any existing drawings we draw the space as it stands, then plan it for the new use: layout, exits, washrooms and fire separations, worked through against Part 10 or Part 11 of the Code, whichever applies.
- Engineers where the new use needs them
If the floor has to carry more, or the fire alarm, sprinklers, ventilation or plumbing must change, the engineers' scope is agreed and their drawings are checked against ours.
- Zoning Applicable Law Certificate, then the permit
Toronto counts a permit application as complete only with an issued Zoning Applicable Law Certificate (the City's zoning and applicable-law review of the drawings). The drawings go in for it, then with the permit application, and we answer the examiner's questions until the City decides.
Who designs which part?
One permit set, with the right designer on every part.
Our part
The building
Layout, walls, exits, fire separations and the outside of the building
Designed byArchitalcan, BCIN-registered, while the whole building stays within 3 storeys and 600 m² with no restaurant in it. Past that, an architect.

Structure
Beams, columns, footings, slabs and any new opening in a wall
Designed byA professional engineer, or a designer registered in Building Structural.

Heating, cooling and ventilation
Rooftop units, ductwork, exhaust and energy efficiency
Designed byA professional engineer, or a designer registered in Building Services. Architalcan's HVAC class covers houses only.

Sprinklers and fire alarm
Sprinkler piping, alarm and detection
Designed byEngineers, or designers registered for that work: Fire Protection; Detection, Lighting and Power.

Plumbing
Washrooms, drains and water supply
Designed byAn engineer, or a designer registered in Plumbing – All Buildings.

Lighting and power
Lighting, emergency power and the electrical service
Designed byAn engineer, or a designer registered for that work.
What does it cost?
Design and permit fees for a change of use: the City's, and ours.
Paid to the City of Toronto
- Change of use permit, City fee
- $92.79/hr
- 2026 rate per hour of intake, review and inspection for a change of use with no construction (By-law 247-2026, Sch. 8 item 109). Toronto Building's fees page lists it as a $297.41 minimum per permit plus $92.79 for each additional hour.
- Alterations with the change, City fee
- $12.45/m²
- 2026 interior alteration rate for Groups A, B and D (assembly; care, treatment and detention; offices and personal services), per m² of the space receiving the work; $11.53/m² for Groups C, E and F (residential, shops and industrial). Minimum $214.79. When the change comes with alterations, this building permit covers it.
- Zoning Use Review, City fee
- $214.79
- 2026, per request, no plans needed. Confirms whether the use is permitted at the address; it does not check parking, loading or the use's conditions.
- Zoning Applicable Law Certificate, City fee
- $888.14
- 2026, for work on a building other than a house: $888.14 up to 300 m², $1,863.82 over 300 m². Up to three reviews; credited against the permit fee when the permit application is filed with it and the City's Declaration Form – Use of Zoning Applicable Law Certificate.
Paid to Architalcan
- Design and permit drawings, our fee
- In writing
- Quoted in writing for your project. Fees of any engineers the new use needs are quoted on their own.
Who will draw it?
Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

“Read all 273 on HomeStars (opens in a new tab)Renovation of a semi in Toronto
Rocco was efficient and effective. He worked closely with us to ensure the design meets our needs and recommended valuable solutions that we previously weren't aware of. We got the permit within a reasonable amount of time despite submitting it just before the holidays.
- Registration
- BCIN 25897 – 41741 Look up the BCIN
- Classes
- House · Small Buildings · Large Buildings · HVAC-House
- On the drawings
- The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
How do I start?
Get a written quote for your change of use.
2842 Bloor St W, Unit 10, Etobicoke
Questions before you send it
Do I need a permit if nothing is being built?
Toronto Building says yes: a permit is required for a change of use even when no construction is proposed. The Building Code Act ties it to the hazard: section 10 requires the permit chiefly where the Code's change-of-use table marks the change “Yes”. Some changes are marked “No”, such as a low- or medium-hazard industrial unit becoming an office when the whole unit changes; because the City's guidance is broader, confirm with Toronto Building before relying on that. If the change comes with alterations, their building permit covers it.
Do I need an architect for a change of use?
It depends on the new use and on the whole building, not your unit. A building of up to three storeys and 600 m² gross area used only for business, personal services, shops, industry or homes is outside the architect requirement (Architects Act, s. 11(3)(a)), so we can design the change itself: the layout, exits, washroom layout and fire separations. Any structural check, fire alarm, sprinkler, ventilation or plumbing change in such a building is designed by an engineer or a designer registered for that work, and an industrial building designed to house an engineered process or equipment needs an engineer (Professional Engineers Act, s. 12(4)). Building work for an assembly use, or in a business or shop building over 600 m² or three storeys, needs an architect and an engineer (or, for a restaurant for up to 100 people in a building within those limits, an OAA Licensed Technologist). An industrial building over those limits needs an architect or an engineer, or both where another use in it takes up more than 600 m². In a bigger building, or for an assembly use, a non-architect may still design interior work that does not affect, and is not likely to affect, the structure, fire separations, fire safety systems, an exit to the outside, the main entrance, public corridors or exterior walls, and adds no floor space by a mezzanine, infill or similar element (s. 11(3)(e)), but a change of use often has to touch those.
A tenant wants to open a restaurant. What does that take?
More than a shop does. The Architects Act counts eating and drinking as an assembly use, so the design of the building work comes from an architect or, for a restaurant for up to 100 people in a building of up to three storeys and 600 m², an OAA Licensed Technologist (the holder of a limited licence from the Ontario Association of Architects), with an engineer for the engineering, apart from interior-only work that s. 11(3)(e) allows. Under Part 3, the Building Code lets a restaurant designed for 30 people or fewer be classed with shops (Group E), but that does not change the Architects Act. The zoning must allow an eating establishment: in the CR (commercial residential) zone it is a use permitted with conditions, and in the E (employment) zone all eating establishments on a lot are capped at 500 m². Some business licences, eating and drinking establishments among them, start with the City's zoning review for business licence ($248.67 in 2026). Where the restaurant brings alterations or a new major occupancy, the City recommends the Zoning Applicable Law Certificate instead, because it leads to a complete permit application.
How do I find out whether the new use is allowed at my address?
Toronto Building's Zoning Use Review answers that for $214.79 (2026), with no plans needed, for uses such as office, personal services, commercial, restaurant and manufacturing. It does not look at parking, loading, built form or the conditions attached to the use, and drive-throughs, patios and recycling uses need the full Zoning Applicable Law Certificate instead. If the use is not permitted, the usual routes are a minor variance from the Committee of Adjustment (Planning Act, s. 45) or a rezoning (s. 34). Where the building's present use was lawful before the by-law banned it and has carried on since, the Committee can also permit a similar or more compatible use (s. 45(2)).
Does a change of use need site plan approval?
Not when the zoning already permits the new use and the altered part is no more than 1,000 m²: interior alterations that convert all or part of a building to a permitted use are exempt (Municipal Code § 415-45.3), and an industrial-to-industrial conversion must also leave out uses such as recycling, salvage or concrete batching, and any use the zoning permits only with conditions. The exemption is lost if the conversion includes a place of assembly, place of worship, entertainment place of assembly, drive-through or transportation use. Site plan approval (the City's separate review of a property's layout) is still required where the road must be widened. The City can also require it to protect neighbouring land, for health, safety, accessibility or entrance-access reasons, or within 300 m of a rail line or 120 m of a wetland, lake, shoreline or river valley (§ 415-45.5).
Will the City charge development charges?
Not on existing non-residential floor area converted to another non-residential use without demolition, provided the old use was legally established (Municipal Code § 415-7). The City's overview lists interior alterations that result in a change of use among the projects that may pay, and this conversion rule is what exempts a non-residential change. A change to residential use follows different rules. This is the City's current by-law (1137-2022), which runs to August 2027 unless replaced, and it is up to the owner to show the City that the old use was legal (§ 415-7 C(5) and D).
Can a change of use go through the City's Express service?
No. Toronto's Express Services stream takes small commercial interior alterations only where there is no change in use and no change in patron area (the part customers use), so a change of use is not eligible.
Who signs the drawings?
Drawings within our scope are signed under BCIN 25897 – 41741, with the firm's registration number, the designer's name and qualification number, a signature and a statement taking responsibility for the design, as Toronto Building requires. Where the law requires an architect or engineer, they design and seal that work and sign the Commitment to General Reviews (the form in which they agree to review the work on site).
Often done together
CommercialInterior alterations, change of use and zoning review, with mechanical, electrical, plumbing and sprinkler engineers coordinated.
Commercial interior alterationsInterior alterations for offices, shops and other commercial spaces, drawn for permit.
Industrial unit alterationsAlterations to industrial units, drawn for permit with the engineers coordinated.
Not on the list?
Send the addressChange of use
Get a quoteGet a written quote