Underpinning · Basement lowering
Basement underpinning design in Toronto, coordinated with a Professional Engineer.
We design the lowered basement and draw the underpinning in the numbered stages that Toronto Building (the City's permit office) asks for. We bring in a Professional Engineer where the City requires one, then file the permit set.
Does this sound like my house?
Most underpinning projects start with one of these.
- Your 1920s semi has a 6'4" basement and you want a legal secondary suite with a real ceiling.
- You plan to rent the basement and need 1.95 m of clear height over at least half the floor to pass Property Standards.
- A contractor quoted “benching” and you are not sure how much floor you give up along the walls.
- You want a separate basement entrance and the new stairs land below your existing footing.
- You have been told the job “needs an engineer” and nobody has explained which City rule says so.
- Your foundation needs reinforcing rather than lowering, and the City still wants the work drawn in numbered stages.
How much ceiling can I gain, and will the City want an engineer?
Set the ceiling you want. See what it takes.
Set today's clear height and the height you want. The height bars move as you go. The planner shows the drop, the usual route, when the City requires an engineer, the 1.95 m test and the 2026 permit fee. An estimate; footings and soil are confirmed on site.
Your answers can go with your request.
1.93 m
Floor to the underside of the joists, not to the finished ceiling.
2.29 m
The City prices the permit per linear metre. A full perimeter is all four walls added together.
Result for the sample basement
The floor comes down 14" for 7'6" of clear height.
- Floor comes down
- 356 mm
- 14" of clear height gained
- New height
- 7'6"
- 2.29 m · meets the 1.95 m minimum
- Engineer
- Required
- shared footing: design and site review; testing at the first and last stages, always
- City permit fee, est.
- $371.10
- 30 linear m × $12.37, minimum $214.79 (2026)
- Usual route: underpinning. A bench for this drop would take about 14" of floor off every wall (assuming the soil holds a 45° slope; the real angle depends on the soil). New footings go in beneath the existing ones, in numbered stages.
The City rules behind this
- Shared wall: the party-wall footing is your neighbour's too. Going below it puts the new footing inside the soil's angle of repose (close enough to the neighbour's footing that digging could undermine it), so the City requires a Professional Engineer to design the underpinning and review it on site, with sealed drawings.
- Soil not known: the City's guide says a professional should prepare the design where the soil type is unknown. The engineer decides whether a test pit or borehole is needed to find out.
- Every underpinning permit: testing and reports by a Professional Engineer at the first and last stages, at minimum, to pass the City's inspections.
An estimate, not a design. The drop is the clear height gained; the dig goes deeper, because the old slab comes out and a new slab goes in. Footing depths, soil and the engineer's design are confirmed on site.
What will it take?
What the City requires for underpinning, and what we design.
In short
- Foundation plan in numbered stages with linear metres, as the City's guide requires
- Professional Engineer coordinated: design, Commitment to General Reviews, site testing
- Written quote up front; the City's $12.37 per linear metre listed separately

Toronto Building issues a building permit for a new basement entrance. The site plan must show setbacks to property lines and adjacent buildings, plus a summary of permitted and proposed zoning provisions. The foundation plan shows the underpinning next to the entrance, with the stages numbered. Sections show the exterior landing at the base of the stair, and the guard drawings include their connection details.
toronto.ca · Toronto Building: Residential Basement Entrances permit guide (opens in a new tab)A foundation built below the level of an adjacent building's footing, and within the soil's angle of repose, must be designed by a Professional Engineer. The engineer reviews it on site and the drawings are sealed. The angle of repose is the steepest angle from horizontal at which the soil stays stable. It changes with soil type, and disturbing soil inside it can cause failure.
toronto.ca · Toronto Building: Residential Underpinning permit guide (opens in a new tab)The Commitment to General Reviews form also applies where more than 1.2 m (about 4 ft) of the underpinned wall is left without soil or bracing to hold it from the side, or where the soil is clay or silt. The engineer signs it, the owner completes Part A, and it goes in with the application. Where the soil type is unknown, the City says a professional should prepare the design.
toronto.ca · Toronto Building: Residential Underpinning permit guide (opens in a new tab)Whether or not an engineer had to design the underpinning, Toronto Building requires testing and reports by a Professional Engineer. They cover the first and last construction stages at minimum, and the City needs them to pass inspections.
toronto.ca · Toronto Building: Residential Underpinning permit guide (opens in a new tab)Foundation plans must show existing and proposed walls, underpinning locations, support columns and the framing above. The work stages are numbered in sequence and the linear metres stated. The plan also gives the distance to adjacent foundations and the depth of their footings. Sections show the depth of underpinning and the exterior grade height above the basement floor.
toronto.ca · Toronto Building: documentation index (opens in a new tab)Toronto's Property Standards set the minimum height of a habitable room at 1.95 m over at least half its floor area (§ 629-25 D). Under § 629-4 B, no basement may be used as a habitable room or dwelling unit unless its way out (egress), light, ventilation and ceiling height all comply. Ontario Building Code heights for a new secondary suite are checked separately on the sections.
toronto.ca · Toronto Municipal Code Chapter 629, Property Standards (opens in a new tab)Property lines, lot area, easements, and setback dimensions to property lines and to the neighbours' buildings. For a new entrance, the zoning summary the City asks for as well.
Underpinning locations, support columns and framing above, work stages numbered in sequence, the linear metres stated, and the distance to adjacent foundations with the depth of their footings.
Existing and proposed footing and wall details, the depth of underpinning, the exterior grade height above the new floor, floor-to-floor and floor-to-ceiling heights.
A Professional Engineer designs the underpinning where the City requires it, seals the sheets, and signs the Commitment to General Reviews. We complete the owner's Part A with you.
Fully dimensioned, existing and proposed uses, smoke and carbon monoxide alarm locations, plumbing fixtures, partitions and framing, so the set works for a future suite too.
Materials and specifications for floor and wall assemblies, the typical wall section, stair, landing, guard and handrail details with connections.
Stairs, the exterior landing at the base, guards and handrails, and the underpinning extent next to the entrance in numbered stages, drawn to the City's entrance guide.
Application to Construct or Demolish, Schedule 1 Designer Information, Assumption of Responsibility for Engineering Content, Tree Declaration and the Rental Renovation Licence Screening Form where they apply, all filed as PDFs through Toronto Building's online Application Submission Tool.
- Site visit and measure
We measure today's clear height, the footing depth where it can be seen, and the distance to the neighbours' walls. We note soil and water signs. You tell us the height you want and whether a suite or an entrance is part of the plan.
- Route and engineer
Underpinning or benching, and which City trigger applies: a shared or nearby footing inside the soil's angle of repose (close enough to the neighbour's footing that digging could undermine it), more than 1.2 m of wall left unsupported from the side, or clay or silt soil. We bring in the Professional Engineer and put the quote in writing.
- Drawings
Foundation plans with numbered stages and linear metres, sections to the new depth, floor plans and details from one office. The engineer's sealed sheets and the Assumption of Responsibility for Engineering Content form go alongside.
- Forms and filing
Application to Construct or Demolish, Schedule 1 Designer Information, the Commitment to General Reviews with your Part A, and the Tree Declaration and the Rental Renovation Licence Screening Form as needed. Filed as PDFs through the City's online tool, with the City fee paid at submission.
- Build, test, sign off
Your contractor pours in the numbered sequence. The engineer tests and reports at the first and last stages at minimum, as the City requires to pass inspections. The general review committed to on the form is carried out as well.
What does it cost?
Design and permit fees for underpinning: the City's, and ours.
Paid to the City of Toronto
- Underpinning permit, City fee
- $12.37/linear m
- 2026 Toronto Building rate per linear metre of underpinning, $214.79 minimum, paid at submission. 30 linear metres: $371.10.
- Basement finishing, City fee
- $6.20/m²
- 2026 rate when the basement is finished under the same permit.
- New secondary suite, City fees
- $56.33/unit
- The residential unit fee per new unit, plus interior alterations at $11.53/m² (2026), if the lowered basement becomes a secondary suite.
- Started before the permit issues
- +50%
- City surcharge: 50% of the permit fee or $214.79, whichever is greater, to a maximum of $29,456.99 per permit (2026). Wait for the permit.
Paid to Architalcan
- Design and permit set, our fee
- In writing
- Quoted after the zoning review, with engineer coordination included. The engineer's own fee is quoted alongside it.
Who will draw it?
Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

Photos from Architalcan's Houzz and HomeStars albums.
“Read all 273 on HomeStars (opens in a new tab)Renovation of a semi in Toronto
Rocco was efficient and effective. He worked closely with us to ensure the design meets our needs and recommended valuable solutions that we previously weren't aware of. We got the permit within a reasonable amount of time despite submitting it just before the holidays.
- Registration
- BCIN 25897 – 41741 Look up the BCIN
- Classes
- House · Small Buildings · Large Buildings · HVAC-House
- On the drawings
- The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
How do I start?
Get a written quote for your underpinning project.
2842 Bloor St W, Unit 10, Etobicoke
Questions before you send it
Do I need a building permit to lower my basement in Toronto?
Yes. Toronto Building's Residential Underpinning guide covers a building permit for underpinning the foundation of an existing house. That means new footings beneath the existing ones to gain depth, reinforcing a foundation, or adding a below-grade or partly below-grade entrance. The application is filed as PDFs through Toronto Building's online Application Submission Tool. It carries a site plan on your survey, existing and proposed foundation plans, floor plans, sections, construction details and the forms. The City's fee is covered in the permit-cost question below.
What is the difference between underpinning and benching?
Underpinning builds new footings beneath the existing ones. The work goes in numbered stages so the wall is never undermined all at once, and the new floor runs wall to wall at the lower level. Benching leaves the existing footing alone. The new slab is poured lower in the middle, and a sloped or stepped concrete bench is left along the walls. That bench keeps the soil under the old footing undisturbed within its angle of repose. You keep the footing, you lose floor width, and the deeper you go the wider the bench. For a few inches, benching can be the budget route. For a real change in ceiling height, underpinning is usual. The permit drawings show which, with the stages numbered.
When does the City require a Professional Engineer?
Toronto Building's guide gives three triggers. First, a foundation built below the level of an adjacent building's footing, and within the soil's angle of repose, must be designed by a Professional Engineer. The engineer also reviews it on site, and the drawings carry the seal. Second and third come from the Commitment to General Reviews form. It applies where more than 1.2 m (about 4 ft) of the underpinned wall is left without soil or bracing to hold it from the side, or where the soil is clay or silt. On a semi or row house the party-wall footing is your neighbour's too, so the first trigger applies as soon as you go below it. And on every underpinning permit, whoever designed it, the City requires engineer testing and reports. They happen at the first and last stages at minimum, to pass inspections.
What ceiling height does Toronto require in a lived-in basement?
Toronto's Property Standards (Municipal Code Chapter 629, § 629-25) set a habitable room's minimum height at 1.95 m over at least half its floor area. Under § 629-4, no basement may be used as a habitable room or dwelling unit unless its way out (egress), light, ventilation and ceiling height all comply. A new secondary suite is also examined against the Ontario Building Code, and the City's Secondary Suites guide requires floor-to-ceiling heights on the sections. We design the lowered floor to the stricter figure that applies to your house and write it on the drawings. The ceiling planner on our underpinning page uses the 1.95 m Property Standards test.
What does the City charge for an underpinning permit?
In 2026, $12.37 per linear metre of underpinning, with a $214.79 minimum; 30 linear metres is $371.10. Finishing the basement under the same permit is $6.20 per square metre. If the lowered basement becomes a secondary suite, two more lines apply. The City's Secondary Suites guide lists interior alterations at $11.53 per square metre and a residential unit fee of $56.33 per new unit. Work started before the permit issues adds 50% of the fee or $214.79, whichever is greater, to a maximum of $29,456.99. These are paid to the City at submission and are separate from our fee and the engineer's.
Can I add a walkout entrance at the same time?
Yes, and it is usually the right moment, because the stairs land at the new floor level. The City's Residential Basement Entrances guide asks for the underpinning extent next to the entrance, with the stages numbered. Sections must show the exterior landing at the base of the stairs, and the stair, guard and handrail details include their connections. The site plan carries setbacks to property lines and adjacent buildings, plus a summary of permitted and proposed zoning provisions. Where a below-grade entrance may sit on your lot is a zoning question, and we settle it in the zoning review before the drawings start.
What happens on site once the permit is issued?
Your contractor excavates and pours in the sequence numbered on the foundation plan, so the wall is only ever undermined in short lengths. The Professional Engineer tests and reports at the first and last stages at minimum, which Toronto Building requires to pass inspections. The engineer also carries out the general review committed to on the form. The City inspects against the drawings. That is why the stages, the linear metres and the depth are written on them rather than left to the crew.
Who prepares and signs the underpinning drawings?
Architalcan's office prepares the architectural drawings, and they are signed under BCIN 25897 – 41741 (House, Small Buildings, Large Buildings, HVAC-House). Toronto Building requires drawings by a qualified designer to show the designer's name, registration number, qualification number and signature, plus a statement accepting responsibility. Ours do. The underpinning design is sealed by the Professional Engineer and filed with the Assumption of Responsibility for Engineering Content form. The engineer signs the Commitment to General Reviews, and you complete its Part A.