
Industrial · New buildings and warehouses
New industrial buildings in Toronto, up to 3 storeys and 600 m².
We design new industrial and warehouse buildings of up to 3 storeys and 600 m² across all floors, with engineers on the structure and systems. Past either limit an architect or engineer designs it, and an engineer does if it houses process equipment. First, we check whether site plan approval applies.
In four numbers
- The whole building, every floor above ground. Past it, or past 3 storeys, an architect or a professional engineer designs it.ontario.ca (opens in a new tab)
- 600 m²
- All the industrial buildings on the lands together: up to this, a new one can be exempt from site plan approval, with exceptions.toronto.ca (opens in a new tab)
- 2,000 m²
- The City's 2026 permit fee for a finished industrial building; $12.37 as a shell.toronto.ca (opens in a new tab)
- $17.01/m²
- Industrial uses pay no City development charges: manufacturing, warehousing, distribution and their offices.toronto.ca (opens in a new tab)
- Exempt
Does this sound like my property?
Most new industrial buildings start with one of these.

A warehouse or workshop
You own a lot in an employment zone and want a small warehouse, workshop or manufacturing building on it.

A second building on the lot
There is already an industrial building on the lot, and you need to know whether a second one still fits the City's 2,000 m² site plan exemption.

Racking with walkways
The new building will hold racking with raised platforms or walkways for staff, which an engineer must design and review whatever the building's size.

Demolition first
An old building on the lot comes down first, and the demolition needs a permit too.

Near a rail line, ravine or the lake
The lot is near a rail line, a ravine or the lake, where the City may ask for site plan approval even for an exempt building.
Does my project need an architect?
It depends on the size and use of the whole building.

No architect needed
We design it
- A building of up to 3 storeys and 600 m², used for industry, offices or shops.
- Interior work in a building of any size, when it leaves the structure, fire separations, exits, the main entrance and outside walls alone, and adds no floor space.

Past the line
An architect or engineer designs it
- A building of more than 3 storeys or 600 m².
- A building made to house an engineered process, at any size: a professional engineer designs it.
Not sure which side yours is on? We check it from the survey before any drawing starts.
Ask us to checkArchitects Act, s. 11 (opens in a new tab)Professional Engineers Act, s. 12 (opens in a new tab)What will it take?
What the law and the City require for a new industrial building, and what we design.
In short
- Size, use and site plan exemption checked against the law before design starts
- Structure by a professional engineer, building systems by engineers or registered designers, in one permit set
- Our fee quoted in writing; City fees listed separately

The Architects Act lets a designer who is not an architect design an industrial building of not more than 3 storeys and not more than 600 m² of gross area: every floor above grade, measured to the outside of the exterior walls (or to the centre line of a firewall with no access opening or building service through it), for the whole building as built. Over either limit, an architect or a professional engineer must design it, and only an engineer may provide the engineering, provided no other use in the building (offices or a showroom, for example) takes up more than 600 m². If one does, an architect and an engineer are both required, though an engineer may still design the industrial part.
ontario.ca · Architects Act, R.S.O. 1990, c. A.26, ss. 11(3)(a), 11(4) rules 2 and 3 vi, and 11(6) (e-Laws) (opens in a new tab)The same-size building needs no engineer's design under the Professional Engineers Act only if it is not designed to house, and is not part of, an apparatus, process, facility or works whose design is professional engineering. A building put up around engineered process equipment needs an engineer, however small.
ontario.ca · Professional Engineers Act, R.S.O. 1990, c. P.28, s. 12(4) (e-Laws) (opens in a new tab)A new industrial, manufacturing or warehouse building is exempt from site plan approval when all such buildings on the lands, existing and new, total no more than 2,000 m² of gross floor area or the maximum the zoning permits, whichever is greater; it has no asphalt, cement or concrete batching plant, recovery or recycling facility, salvage yard or waste transfer station; and it has no use that Zoning By-law 569-2013 permits only with conditions (where that by-law applies to the lot). Approval is still required where the Official Plan requires a road or lane widening, or where the Chief Building Official, consulting the City's Executive Director of Development Review, finds the project may benefit from review of health, safety, accessibility, neighbouring land or access to the entrances, unless a final minor variance or consent has already secured those matters. It may also be required within 300 m of a railway line (not counting discontinued or abandoned lines, or lines used only by urban rail transit), or within 120 m of a wetland, the Great Lakes shoreline, an inland lake or a river or stream valley.
toronto.ca · Municipal Code Chapter 415, §§ 415-42, 415-45.1 C and 415-45.5 (consolidated July 30, 2026) (opens in a new tab)In the E (Employment Industrial) zone, the number after the E on the zoning map is the lot's maximum floor space index (FSI: the building's gross floor area, less areas such as required loading spaces, basement storage and mechanical rooms, shafts and exit stairs, divided by the lot's area). Where the Height Overlay Map sets no height, only office space is capped (20.0 m); other permitted uses have no height limit. Setbacks are 3.0 m front and side and 7.5 m rear, and 15.0 m from a lot line next to a residential zone, with a 3.0 m strip of soft landscaping along every street line except at driveways and walkways. Loading spaces stay out of the front yard, street side yards, and side or rear yards next to a lot in a residential zone, and a loading space inside the building may not be reached through a wall facing the street.
toronto.ca · Zoning By-law 569-2013, Section 60.20 (E zone) (opens in a new tab)A manufacturing or warehouse use needs no loading space under 100 m², one Type C (6.0 m long, 3.5 m wide, 3.0 m clear height) at 100–499 m², one Type B (11.0 × 3.5 m, 4.0 m clear) at 500–999 m², and one Type A (17.0 × 3.5 m, 4.4 m clear) at 1,000–4,999 m².
toronto.ca · Zoning By-law 569-2013, Chapter 220, 220.5.10.1(7) and 220.5.1.10(8) (opens in a new tab)Toronto Building counts an application as complete only with the completed and signed application form, one set of plans, an issued Zoning Applicable Law Certificate, confirmation that every applicable law it names has been satisfied (site plan approval, for example, where required), and the fees paid. Complete applications for Part 9 buildings (the Building Code's rules for small buildings) other than houses are reviewed within 15 business days, and for Part 3 large buildings within 20. An application without a ZAP has no review time frame.
toronto.ca · Toronto Building: Building Permit Review Streams (opens in a new tab)Toronto asks for it with every new building, Part 9 or Part 3, to show how the building meets the Ontario Building Code.
Lot and building lines from a current Ontario Land Surveyor survey; density, height and setbacks against the zone; the landscaping strip along the street; each loading space with its type and size; parking within the by-law's maximum; fire route, hydrants, fire department connection and grades.
The use of every space, fire separations and the framing above as the structural engineer designs it; the roof plan with drainage and the rooftop equipment and its screening.
Each wall's exposed face and its openings (doors, loading doors, windows) as a share of the wall, against the limiting distance (the distance from the wall to the property line, to the centre line of a street or lane, or to a line drawn between two buildings on the same lot, which caps those openings); overall and floor-to-floor heights, stairs and guards.
Wall, floor and roof assemblies, a typical wall section and roof detail, guard details, door and room finish schedules.
Structure (steel frame, precast concrete walls, footings and slab) by a professional engineer; HVAC by a mechanical engineer or a designer registered in Building Services; the energy efficiency design (SB-10) and the City's energy efficiency form by the mechanical engineer or Building Services designer; plumbing, sprinklers and fire alarm by their engineers or registered designers; a shelf and rack storage system (racking with raised platforms or walkways for staff) by an engineer, as the Building Code requires. Checked against our sheets so the set goes in as one.
The permit application, Schedule 1 (designer information), the Vibration Control Form, the Declaration Form – Use of Zoning Applicable Law Certificate, the Overhead Electrical Conductors declaration, the Municipal Road Damage Form with its deposit (not needed when the project goes through site plan approval), a Tree Declaration where trees could be harmed, and, where an architect or engineer must review the work, the Commitment to General Reviews that you and they sign.
- Size and occupancy check
From the survey and what the building will do, we set its storeys, its gross area above ground, its occupancy (what it is used for, as the Building Code groups it: F1 high-hazard, F2 medium-hazard or F3 low-hazard industrial) and how much floor area any offices or showroom take up. That decides whether the Architects Act lets us design it, whether the Building Code's Part 9 (small buildings) or Part 3 (larger and high-hazard buildings) applies, and whether process equipment calls for an engineer.
- Zoning and site plan check
The zone label gives the density, the Height Overlay Map any height limit, and the zone's rules the setbacks; then loading, parking and landscaping. Last, whether all industrial buildings on the lot stay within the 2,000 m² site plan exemption, and whether a rail line, ravine or shoreline nearby could bring the City's review back.
- Engineers brought in
A structural engineer for the frame, precast walls, footings and slab; a mechanical engineer or Building Services designer for HVAC and energy efficiency; plumbing, sprinkler and fire alarm designers as the building needs, and an engineer for any racking with raised platforms or walkways. Their scope is agreed before drawing starts.
- Zoning Applicable Law Certificate
The site plan, zoning summary, floor plans, elevations and sections go to Toronto Building for its zoning check of the drawings (the ZAP). It includes up to three reviews, and its fee is credited to the permit fee when the permit application is filed with it and the City's declaration form within a year of the certificate's issue.
- Permit set filed and answered15 or 20 business days (City)
The coordinated set, the forms and the ZAP are filed together, with the approvals the ZAP lists already in hand and the fees paid, so the application counts as complete. We answer every question from the City's examiner until the City decides.
Who designs which part?
One permit set, with the right designer on every part.
Our part
The building
Layout, walls, exits, fire separations and the outside of the building
Designed byArchitalcan, BCIN-registered, while the whole building stays within 3 storeys and 600 m². Past that, an architect or a professional engineer.

Structure
Beams, columns, footings, slabs and any new opening in a wall
Designed byA professional engineer, or a designer registered in Building Structural.

Heating, cooling and ventilation
Rooftop units, ductwork, exhaust and energy efficiency
Designed byA professional engineer, or a designer registered in Building Services. Architalcan's HVAC class covers houses only.

Sprinklers and fire alarm
Sprinkler piping, alarm and detection
Designed byEngineers, or designers registered for that work: Fire Protection; Detection, Lighting and Power.

Plumbing
Washrooms, drains and water supply
Designed byAn engineer, or a designer registered in Plumbing – All Buildings.

Racking with walkways
Storage racking with raised platforms or walkways for staff
Designed byA professional engineer, as the Building Code requires, whatever the building's size.
What does it cost?
Permit and design fees for a new industrial building: the City's, and ours.
Paid to the City of Toronto
- Building permit, finished building, City fee
- $17.01/m²
- 2026 rate for a finished industrial building or warehouse under 7,500 m², with a $214.79 minimum. Example: a 600 m² finished building is $10,206.
- Building permit, shell building, City fee
- $12.37/m²
- 2026 rate for an industrial, warehouse or self-storage shell under 7,500 m². The same 600 m² as a shell is $7,422.
- Zoning Applicable Law Certificate, City fee
- $1,863.82
- 2026 fee for a new building over 300 m² ($888.14 for 300 m² or less). Not refunded once review has started (75% back if cancelled before any review). Credited against the permit fee when the permit application is filed with it, and the City's declaration form, within a year of its issue.
- Development charges, City by-law
- Exempt for industrial uses
- Toronto's development charges by-law exempts industrial uses: manufacturing, warehousing, distribution and related research, with their accessory offices. A building used only for offices (unless attached to an industrial building), a warehouse club or a retail warehouse is not exempt, and the owner must show the use is legally established.
- Education development charge (TCDSB), collected by the City
- $1.67 per sq ft of gross floor area
- 2026 non-residential rate to December 2, 2026; $1.77 from December 3, 2026. Check the Toronto Catholic District School Board's by-law for exemptions.
Paid to Architalcan
- Design and permit set, our fee
- In writing
- Quoted once the survey, the use and the building's size are known.
Paid to the engineer or other designer
- Engineers' design, their fee
- Their own quote
- Structural, mechanical and any racking, plumbing or fire protection design is quoted separately by each engineer or designer.
Who will draw it?
Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

“Read all 273 on HomeStars (opens in a new tab)Renovation of a semi in Toronto
Rocco was efficient and effective. He worked closely with us to ensure the design meets our needs and recommended valuable solutions that we previously weren't aware of. We got the permit within a reasonable amount of time despite submitting it just before the holidays.
- Registration
- BCIN 25897 – 41741 Look up the BCIN
- Classes
- House · Small Buildings · Large Buildings · HVAC-House
- On the drawings
- The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
How do I start?
Get a written quote for your new industrial building.
2842 Bloor St W, Unit 10, Etobicoke
Questions before you send it
How big can a new industrial building be before it needs an architect?
Up to 3 storeys and 600 m² of gross area, which counts every floor above grade, measured to the outside of the exterior walls (or to the centre line of a firewall with no access opening or building service through it), for the whole building as built. Over either limit, the Architects Act requires an architect or a professional engineer to design it (an architect and an engineer if another use in the building, such as offices, exceeds 600 m²), the Building Code requires them to review the construction, and under the Building Code Act the City's chief building official issues a permit unless, among other things, the law requires that design and the building was not so designed. Where the law requires an architect or engineer, they design that work, not us.
Why do the limits say 600 m² in one place and 2,000 m² in another?
They measure different things. The Architects Act's 600 m² is gross area: all floors above grade. The Building Code's 600 m² is building area, the largest floor above ground, and decides between Part 9 (F2 and F3 buildings of up to 3 storeys) and Part 3; an F1 high-hazard building is always Part 3. The 2,000 m² is the site plan exemption, counting every industrial building on the lot. A one-storey 1,500 m² warehouse can be exempt from site plan approval and still need an architect or engineer to design it.
Who designs the steel frame, the precast walls and the slab?
A professional engineer designs the structure. The HVAC, plumbing, sprinklers and fire alarm are designed by engineers or by designers registered in the Building Code's own classes for that work (Building Services, Plumbing – All Buildings, Fire Protection, and Detection, Lighting and Power). The Code also requires an engineer for a shelf and rack storage system (racking with one or more raised platforms or walkways for staff), and for foundations that go below a neighbouring building's footings within the soil's angle of repose (the slope at which it stays put), or any underpinning, even in a building small enough to need no architect.
We already have an industrial building on the lot. Does a second one still avoid site plan approval?
Only if all the industrial, manufacturing and warehouse buildings on the lands, the existing ones and the new one, total no more than 2,000 m² of gross floor area, or the zoning's maximum if that is greater. Separately, a non-residential building of less than 100 m² that serves the main building is exempt on its own. The 2,000 m² exemption also needs the building's uses to qualify (no listed heavy use, and no use the zoning permits only with conditions), and both exemptions give way where the City requires site plan approval anyway: a road or lane widening, review of safety, access or neighbouring land, or a site near a rail line, ravine or the lake.
Can we start the foundations before the full permit is issued?
Two routes. Once the full permit application has been accepted, a partial permit can be applied for, for example for the foundations: the City reviews it against the plans already filed, it adds $309.30 (2026), and it does not mean the rest of the building will be approved. The other route is a conditional permit, which the Chief Building Official may issue at their discretion when the time other approvals take is causing unreasonable construction delays; the City says it is generally used for larger developments. The full application must be filed and complete, and the zoning must comply, along with certain other approvals the Building Code lists (a conservation authority permit or heritage consent, for example). You sign an agreement that puts the risk on you, including removing the work and restoring the site if the full permit is not obtained; it sets 12 months to get the outstanding approvals and 60 days to start construction. It adds 10% to the permit fees (2026: at least $309.31, at most $3,092.98). Building without a permit is an offence under the Building Code Act, and the City also adds 50% to the permit fee (at least $214.79, up to $29,456.99).
Do we pay development charges on a new industrial building?
Toronto's development charges by-law exempts industrial uses: manufacturing, warehousing, distribution centres, truck terminals and related research, with their accessory offices and retail. It does not cover a building used only for offices unless it is attached to an industrial building, a warehouse club or a retail warehouse, and you must show the use is legally established. The City also collects an education development charge for the Toronto Catholic District School Board on non-residential floor area ($1.67 per sq ft to December 2, 2026, then $1.77) under that board's own by-law, so check that by-law for exemptions. The City's parkland rule (2% of the land for non-residential development) lists industrial uses among its exemptions.
An old building on the lot has to come down first. What changes?
Demolition needs a permit as well. The applicant must retain a professional engineer to review the demolition if the old building is over 3 storeys or 600 m² of building area, has pre-tensioned or post-tensioned members, will be demolished below a neighbouring building's footings within the soil's angle of repose, or will come down with explosives or a laser.
Do these zoning numbers apply to every industrial lot?
No. Toronto has four employment industrial zones: EL (light manufacturing close to homes and open space), E (general manufacturing and industry), EH (heavy manufacturing) and EO (light manufacturing and offices in a business park), each with its own rules; the numbers on this page are the E zone's. A zone label with "(x" and a number points to site-specific rules in Chapter 900, and some lands are still under one of the former municipalities' general zoning by-laws. The rules are read for your lot from the survey and the zoning map.
Often done together
IndustrialUnit alterations, additions and new buildings up to 3 storeys and 600 m², with the engineers coordinated.
Industrial unit alterationsAlterations to industrial units, drawn for permit with the engineers coordinated.
New commercial buildingsNew office, clinic and shop buildings of up to 3 storeys and 600 m², from the zoning review to the permit drawings.
Not on the list?
Send the addressNew industrial buildings
Get a quoteGet a written quote