Commercial and industrial · HVAC coordination

Commercial and industrial HVAC in Toronto. Planned with the building.

Commercial and industrial heating, cooling and ventilation are designed by an engineer or, in smaller buildings, a designer registered in Building Services; the firm's HVAC class covers houses only. We check who may design yours, draw the building side where the law allows, and put both into one permit set.

In four numbers

The City's 2026 flat fee to add a unit heater, make-up air unit or exhaust fan, or to alter ductwork.toronto.ca (opens in a new tab)
$214.79
The City's 2026 flat fee to replace a boiler, furnace or air-conditioning unit.toronto.ca (opens in a new tab)
$386.62
Extra City fee when the HVAC goes in with the building permit, unless it includes a specialty system.toronto.ca (opens in a new tab)
$0
Past it or 3 storeys for the whole building, or with a restaurant, the HVAC must be a professional engineer's design.ontario.ca (opens in a new tab)
600 m²

Does this sound like my property?

HVAC work on a commercial or industrial building usually starts with one of these.

If one sounds like yours, say so in your request, and Rocco starts from there.
  • Stock photo of a city office building's flat roof seen from above, with rows of heating and cooling equipment

    A new or replaced rooftop unit

    The rooftop heating and cooling unit (rooftop unit) on your plaza or industrial building is being replaced or added, and you need to know what the permit takes.

  • Stock photo of a white office corridor with exposed ductwork and pipes along the ceiling

    Ductwork that moves with a fit-out

    Your tenant's fit-out moves interior partitions, so the ductwork, diffusers and thermostats have to move with them.

  • Stock photo of two galvanized ventilation hoods on the metal roof of an industrial building

    Heaters or exhaust for a unit

    Your industrial unit needs unit heaters, a make-up air unit or an exhaust fan for a new tenant or process.

  • Stock photo of a mechanical room with insulated pipes, valves and a large steel tank

    Room for equipment in a new design

    You are planning an addition or a new building of up to 3 storeys and 600 m² gross area for offices, shops or industry, and the mechanical room, shafts and rooftop equipment need room in the design from the start.

  • Stock photo of a hand on a mouse beside a marked-up drawing, a pen and a calculator on a desk

    The examiner asked for calculations

    The City's examiner has asked for heat loss and gain, duct design or ventilation calculations you do not have.

Does my project need an architect?

It depends on the size and use of the whole building.

Ontario's Architects Act sets the line at 3 storeys and 600 m², counting every floor above ground of the whole building after the work, not just your unit.
Stock photo of a one-storey brick office building with dark windows beside its parking lot

No architect needed

We design it

  • A building of up to 3 storeys and 600 m², used for offices, services or shops.
  • Interior work in a building of any size, when it leaves the structure, fire separations, exits, the main entrance and outside walls alone, and adds no floor space.
Stock photo of a five-storey office building in dark brick and glass above a landscaped entrance

Past the line

An architect designs it

  • A building of more than 3 storeys or 600 m².
  • A restaurant or bar, beyond the interior work. For up to 100 people, in a building within the line, an OAA Licensed Technologist may design it instead.

Not sure which side yours is on? We check it from the survey before any drawing starts.

Ask us to checkArchitects Act, s. 11 (opens in a new tab)

What will it take?

What the City requires for commercial and industrial HVAC, and who designs each part.

The rules in plain English, each linked to its source, then every sheet in the set and each step from start to finish.

In short

  • Who may design your HVAC, checked against the building's use and size before anything is drawn
  • The HVAC designer's drawings coordinated with ours into one permit set
  • Our fee quoted in writing; the City's and the HVAC designer's fees listed separately
Stock photo of a rusted exhaust fan set into a brick wall

The Code's Part 9 sections on ventilation (9.32) and on heating and air conditioning (9.33) are written for homes. “Ventilation of all other occupancies shall comply with Part 6”, and so must heating and air conditioning other than a system serving one dwelling unit, even in a small building.

ontario.ca · Ontario Building Code, Div. B 9.32.1.1 and 9.33.1.1 (2024 compendium) (opens in a new tab)

Who designs which part?

One permit set, with the right designer on every part.

On a commercial or industrial building, the Building Code and the Architects Act decide who may design each part. We draw the building where the law allows it, then fold the engineers' drawings into one set the City reviews together.
  • Stock photo of a pencil sketch of a building on paper, with markers and tape on a wooden deskOur part

    The building

    Layout, walls, exits, fire separations and the outside of the building

    Designed byArchitalcan, BCIN-registered, while the whole building stays within 3 storeys and 600 m² with no restaurant in it. Past that, an architect.

  • Stock photo of red steel beams and columns of a building frame against a pale sky

    Structure

    Beams, columns, footings, slabs and any new opening in a wall

    Designed byA professional engineer, or a designer registered in Building Structural.

  • Stock photo of a rooftop heating and cooling unit and two small condensers on a flat roof with a ladder and patches of snowThis page

    Heating, cooling and ventilation

    Rooftop units, ductwork, exhaust and energy efficiency

    Designed byA professional engineer, or a designer registered in Building Services. Architalcan's HVAC class covers houses only.

  • Stock photo of red sprinkler pipes hung beneath the dark roof of a building under construction

    Sprinklers and fire alarm

    Sprinkler piping, alarm and detection

    Designed byEngineers, or designers registered for that work: Fire Protection; Detection, Lighting and Power.

  • Stock photo of two copper water pipes running up inside an opened wall

    Plumbing

    Washrooms, drains and water supply

    Designed byAn engineer, or a designer registered in Plumbing – All Buildings.

  • Stock photo of an electrical room lined with switchgear cabinets on both sides of a narrow aisle

    Lighting and power

    Lighting, emergency power and the electrical service

    Designed byAn engineer, or a designer registered for that work.

What does it cost?

Permit and design fees for HVAC work: the City's, the HVAC designer's, and ours.

The City's bill, ours and the engineer's, kept apart. The City's fees follow its published 2026 schedules and are paid when each application is filed. Ours is quoted in writing; an engineer's or consultant's fee, where one is needed, is quoted on its own.

Paid to the City of Toronto

HVAC filed with the building permit, City fee
No extra fee
When the HVAC goes in with the building permit application, Toronto Building charges nothing more for it unless there is a specialty system, a term its Related Mechanical (HVAC) guide does not define; ask Toronto Building whether a kitchen exhaust, spray booth or dust collector counts.
Stand-alone HVAC permit, offices and shops, City fee
$1.55/m²
2026, for offices, shops and other Group D and E uses. Assembly uses, institutions and restaurants $1.91/m²; an industrial building up to 230 m² a flat $231.97, a larger one $1.07/m² (laboratories $1.91/m², parking garages $0.40/m²). The City's minimum for any permit is $214.79 (Toronto Building fees page).
HVAC alteration, City fee
$214.79
2026 flat fee for adding a unit heater, make-up air unit (a unit that brings in heated outdoor air to replace air that is exhausted) or exhaust fan, or for altering ductwork. Replacing a boiler, furnace or air-conditioning unit is a flat $386.62.
Special ventilation system, City fee
$463.95
2026 flat fee for a commercial kitchen exhaust, spray booth, dust collector or similar system.

Paid to Architalcan

Building drawings and coordination, our fee
In writing
Quoted after the building and use check, from the address, the building's size and the HVAC work planned.

Paid to the engineer or other designer

HVAC design (engineer or Building Services designer) and roof structure
Quoted separately
The professional engineer or Building Services designer prices the heating, cooling and ventilation design, and a professional engineer or Building Structural designer any roof structure, each on their own line.

Who will draw it?

Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

The heating, cooling and ventilation are designed and signed by a professional engineer or a designer registered in Building Services, because the firm's HVAC class covers houses only. Architalcan draws the building side within its classes and the Architects Act's limits, and coordinates the set. Rated 5.0 from 273 reviews on HomeStars.
Rocco Schipano holding the HomeStars Best of the Best 2023 award

Renovation of a semi in Toronto

Rocco was efficient and effective. He worked closely with us to ensure the design meets our needs and recommended valuable solutions that we previously weren't aware of. We got the permit within a reasonable amount of time despite submitting it just before the holidays.

HomeOwner · Jan 17, 2025
Read all 273 on HomeStars (opens in a new tab)
Registration
BCIN 25897 – 41741 Look up the BCIN
Classes
House · Small Buildings · Large Buildings · HVAC-House
On the drawings
The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
About Rocco and the firm

How do I start?

Get a written quote for the building drawings around your HVAC work.

Send the address, what the building is used for, its storeys and rough floor area, and the HVAC work planned (a new or replacement rooftop unit, ductwork in a fit-out, heaters or exhaust). Rocco checks who may design it and replies in writing with what the permit needs, who draws each part and a quote for ours.

Step 2 of 3 · Property

Project:Commercial

Where is the property?
Do you have a property survey?

A survey lets us confirm setbacks and buildable area from the start. No survey? We'll tell you how to get one.

BCIN registered · Insured · 20+ years in Toronto

Questions before you send it

Can you design the HVAC for my shop, office or industrial unit?

No. Ontario's public registry (QuARTS, checked October 30, 2026) lists the firm's classes as House, Small Buildings, Large Buildings and HVAC-House. HVAC-House covers heating, cooling and ventilation in a house; in a shop, office or industrial building those systems follow Part 6 of the Building Code and belong to the Building Services class, which the firm does not hold. A professional engineer or a Building Services designer designs and signs them. We check who may design the work, draw the building around it where the Architects Act lets us (a whole building, after the work, of up to 3 storeys and 600 m² gross area with no restaurant or other assembly use: s. 11(3)(a)), and coordinate their drawings and ours into one permit set.

Do I need a permit to replace a rooftop unit?

Expect one. Toronto Building's “When Do I Need a Building Permit?” page lists installing or modifying heating systems among the work that needs a permit, and its examples of work that needs none, replacing a furnace or boiler or adding cooling, apply only in a house. The City's 2026 stand-alone HVAC fees include a flat $386.62 for replacing a boiler, furnace or air-conditioning unit. If the new unit is heavier, larger or in a new spot, a professional engineer (or, in a building small enough not to need one, a Building Structural designer) checks the roof structure, and the zoning limits on rooftop equipment apply.

Does the size of the building change who designs the HVAC?

Yes. Where the whole building, after the work, has no more than 3 storeys and 600 m² of floor area on all its floors above ground, is used for business, personal services, shops or industry, and does not house an engineered process, the Professional Engineers Act does not require an engineer, so a designer registered in Building Services may design the HVAC. A bigger building needs a professional engineer. The test is the whole building, so a 150 m² unit in a 2,000 m² plaza is usually over the line; only a firewall with no access opening or building service through it lets the area be measured to that wall. A restaurant, bar or other assembly use anywhere in the building also takes it outside the exception. The Architects Act draws nearly the same line around our part: past those limits, or with a restaurant or other assembly use in the building, the roof plan, screens, shafts and fire separations are an architect's work (an architect's or engineer's in an industrial building), and we draw only interior work that leaves the structure, fire separations, exits and exterior walls unchanged.

What does the City charge for the HVAC permit?

If the HVAC goes in with a building permit application, nothing extra unless there is a specialty system. On its own it is a stand-alone mechanical permit: in 2026, $1.55/m² for offices and shops, flat fees from $214.79 for smaller jobs such as an added unit heater or exhaust fan, and $463.95 for a kitchen exhaust, spray booth or dust collector. Our fee and the HVAC designer's are separate.

My tenant is opening a restaurant and needs a kitchen exhaust hood. Who designs it?

A professional engineer. The Building Code requires the ventilation for commercial cooking equipment to meet NFPA 96, the standard for ventilation and fire protection in commercial kitchens. The Professional Engineers Act counts eating or drinking as an assembly use, and its small-building exception does not cover assembly, so in a building with a restaurant the engineering, the kitchen exhaust included, is a professional engineer's at any size. On its own the exhaust is a $463.95 special ventilation permit (2026). The Architects Act treats the restaurant the same way: its design needs an architect or, for a restaurant for up to 100 people in a building of up to 3 storeys and 600 m² gross area, an OAA Licensed Technologist. Its exception for interior work covers only work that touches no structure, fire separation, main entrance, public corridor, exit or exterior wall and adds no floor space. We can tell you which applies before anything is drawn.

Do you design HVAC for houses?

Yes. That is what the firm's HVAC-House class covers: heating, cooling and ventilation designed to Sections 9.32 and 9.33 of the Building Code for a house of up to two dwelling units, where each system serves one dwelling unit (or is radiant heating in a house with a secondary suite), drawn into the same permit set as an addition, a basement apartment or a new home. One forced-air system shared by both units falls under Part 6 instead, outside that class.

Who signs the HVAC drawings?

Whoever designs them. A professional engineer seals theirs; a Building Services designer's drawings carry their name, registration and qualification numbers, signature and a statement taking responsibility, and they file Schedule 1 (Designer Information) with the application. Our drawings carry BCIN 25897 – 41741 the same way. Where the Building Code calls for an architect's or engineer's review on site, the architect or engineer and the owner (or the owner's agent) sign the Commitment to General Reviews, the form in which the architect or engineer agrees to review the work as it is built.