Commercial and industrial · HVAC coordination
Commercial and industrial HVAC in Toronto. Planned with the building.
Commercial and industrial heating, cooling and ventilation are designed by an engineer or, in smaller buildings, a designer registered in Building Services; the firm's HVAC class covers houses only. We check who may design yours, draw the building side where the law allows, and put both into one permit set.
In four numbers
- The City's 2026 flat fee to add a unit heater, make-up air unit or exhaust fan, or to alter ductwork.toronto.ca (opens in a new tab)
- $214.79
- The City's 2026 flat fee to replace a boiler, furnace or air-conditioning unit.toronto.ca (opens in a new tab)
- $386.62
- Extra City fee when the HVAC goes in with the building permit, unless it includes a specialty system.toronto.ca (opens in a new tab)
- $0
- Past it or 3 storeys for the whole building, or with a restaurant, the HVAC must be a professional engineer's design.ontario.ca (opens in a new tab)
- 600 m²
Does this sound like my property?
HVAC work on a commercial or industrial building usually starts with one of these.

A new or replaced rooftop unit
The rooftop heating and cooling unit (rooftop unit) on your plaza or industrial building is being replaced or added, and you need to know what the permit takes.

Ductwork that moves with a fit-out
Your tenant's fit-out moves interior partitions, so the ductwork, diffusers and thermostats have to move with them.

Heaters or exhaust for a unit
Your industrial unit needs unit heaters, a make-up air unit or an exhaust fan for a new tenant or process.

Room for equipment in a new design
You are planning an addition or a new building of up to 3 storeys and 600 m² gross area for offices, shops or industry, and the mechanical room, shafts and rooftop equipment need room in the design from the start.

The examiner asked for calculations
The City's examiner has asked for heat loss and gain, duct design or ventilation calculations you do not have.
Does my project need an architect?
It depends on the size and use of the whole building.

No architect needed
We design it
- A building of up to 3 storeys and 600 m², used for offices, services or shops.
- Interior work in a building of any size, when it leaves the structure, fire separations, exits, the main entrance and outside walls alone, and adds no floor space.

Past the line
An architect designs it
- A building of more than 3 storeys or 600 m².
- A restaurant or bar, beyond the interior work. For up to 100 people, in a building within the line, an OAA Licensed Technologist may design it instead.
Not sure which side yours is on? We check it from the survey before any drawing starts.
Ask us to checkArchitects Act, s. 11 (opens in a new tab)What will it take?
What the City requires for commercial and industrial HVAC, and who designs each part.
In short
- Who may design your HVAC, checked against the building's use and size before anything is drawn
- The HVAC designer's drawings coordinated with ours into one permit set
- Our fee quoted in writing; the City's and the HVAC designer's fees listed separately

The Code's Part 9 sections on ventilation (9.32) and on heating and air conditioning (9.33) are written for homes. “Ventilation of all other occupancies shall comply with Part 6”, and so must heating and air conditioning other than a system serving one dwelling unit, even in a small building.
ontario.ca · Ontario Building Code, Div. B 9.32.1.1 and 9.33.1.1 (2024 compendium) (opens in a new tab)Part 6 calls for HVAC designed to good engineering practice, such as the ASHRAE, NFPA and SMACNA documents, outdoor air supplied to ANSI/ASHRAE 62.1 (storage and repair garages follow their own article), commercial kitchen ventilation to NFPA 96, and outdoor air intakes at least 7.6 m from a truck loading area or dock, 4.5 m from garbage storage and 3.0 m from a kitchen exhaust outlet.
ontario.ca · Ontario Building Code, Div. B 6.2.1.1, 6.3.1.1, 6.3.1.6 and Table 6.3.2.9 (2024 compendium) (opens in a new tab)Ontario registers building designers by class. Heating, cooling and ventilation under Part 6 belong to the Building Services class; the HVAC-House class covers only a house's systems, and the Small Buildings and Large Buildings classes leave Building Services out. A designer may work in another class only where it is not a substantial part of the design on a project. The firm's registration lists House, Small Buildings, Large Buildings and HVAC-House, so commercial and industrial HVAC is designed by a professional engineer or a Building Services designer, not by us.
ontario.ca · Ontario Building Code, Div. C Table 3.5.2.1, Items 2, 3, 7 and 8, and Note 2 (2024 compendium) (opens in a new tab)The Professional Engineers Act does not require an engineer for the design of a building that, after the work, has no more than 3 storeys and 600 m² of gross area (all floors above ground, measured to the outside of the walls, or to the centre line of a firewall that no access opening or building service passes through), is used for homes, business, personal services, shops, industry or farming, and does not house an engineered process or facility (s. 12(4)). A restaurant or other assembly use is not on that list. The test is the whole building, not your unit. Past those limits, the mechanical design is a professional engineer's work.
ontario.ca · Professional Engineers Act, R.S.O. 1990, c. P.28, s. 12 (e-Laws) (opens in a new tab)For HVAC work, on its own or with a building permit, Toronto Building asks for the mechanical layout at each floor; the type, location and size of the equipment; heat loss and heat gain calculations; duct design calculations; and the mechanical ventilation calculations and design. Drawings by a qualified designer must show their name, registration number, qualification number, signature and a statement taking responsibility, and every designer who is not an engineer or architect files Schedule 1 (Designer Information).
toronto.ca · Toronto Building: Stand-alone Mechanical (HVAC) guide (its Related Mechanical (HVAC) guide asks for the same) (opens in a new tab)In the commercial, commercial residential, commercial residential employment and employment industrial zones of Zoning By-law 569-2013, mechanical and ventilation equipment on a roof, and the screens around it, may rise 5.0 m above the building's height limit. Everything above the limit, stair and elevator enclosures included, may cover no more than 30% of the roof, and within 6.0 m of a lot line on a street its total width may not exceed 20% of the width of the main walls facing that street. Tower roofs in the commercial residential zones, site-specific exceptions and lands still under a former zoning by-law can change this address by address.
toronto.ca · Zoning By-law 569-2013, 60.5.40.10(4)–(5) (the commercial zones have the same rule at 30.5.40.10, 40.5.40.10 and 50.5.40.10) (opens in a new tab)Where each rooftop unit, its curb (the raised frame it sits on) and its screen sit, checked against the zoning limits on rooftop equipment: no more than 5.0 m over the height limit, and, for anything above the height limit, 30% of the roof and 20% of the street wall's width near the street. We draw it where the whole building has up to 3 storeys and 600 m² gross area and no restaurant or other assembly use; in a bigger building it is an architect's work (an architect's or engineer's in an industrial building).
The mechanical room, shafts and ceiling space the HVAC designer needs, and every place a duct crosses a fire separation (a wall or floor built to hold back fire), shown on our plans so the two sets agree. In a bigger building, or one with a restaurant, new shafts and fire separations are an architect's to design, and our plans cover only interior work that leaves them unchanged.
Our site plan and elevations show the truck loading area or dock, garbage storage and kitchen exhaust outlets, so the HVAC designer can keep each outdoor air intake at least the Code's minimum distance from them: 7.6 m, 4.5 m and 3.0 m.
The permit application, Schedule 1 (Designer Information) from each designer who is not an engineer or architect, and, where the Building Code calls for an architect's or engineer's review on site, the Commitment to General Reviews, signed by the owner (or the owner's agent) and the architect or engineer.
- Building, use and size check
From the address, the survey and any existing drawings, we confirm what the building is used for, how many storeys it has and its gross area (all floors above ground, measured to the outside of the walls). Those decide who may design the HVAC and the rest of the work, our part included, and you hear it before anything is drawn.
- The HVAC designer brought in
A professional engineer takes on the heating, cooling and ventilation, or, in a building of up to 3 storeys and 600 m² gross area used for offices, shops, services or industry, with no assembly use such as a restaurant and no engineered process, a designer registered in Building Services may. If equipment is added or moved, a professional engineer, or in such a building a Building Structural designer, takes on the roof structure. Their drawings show the mechanical layout on each floor, the equipment, and the heat loss and gain, duct and ventilation calculations. Their scope is agreed before drawing starts.
- The building side drawn
In a building of up to 3 storeys and 600 m² gross area used for offices, shops or industry: the roof plan with equipment and screens, floor plans with the mechanical room, shafts and fire separations, and the zoning check for rooftop equipment. In a bigger building, or one with a restaurant or other assembly use, an architect designs that part (in an industrial building, an architect or engineer), and our drawings cover only interior work that leaves the structure, fire separations, exits, main entrances, public corridors and exterior walls unchanged. You hear which applies at the first check.
- One coordinated set
Unit positions, duct routes, roof openings, intakes and exhausts coordinated across the HVAC drawings, the structure and ours, so the examiner sees one building.
- Filed with the building permit, or on its own
HVAC that is part of a larger project goes in as a related mechanical (HVAC) permit with the building permit application (online applicants file it just after); HVAC work with no other construction goes in as a stand-alone mechanical permit. The examiner's questions on the mechanical design are answered by its designer, and questions on our drawings by us.
Who designs which part?
One permit set, with the right designer on every part.
Our part
The building
Layout, walls, exits, fire separations and the outside of the building
Designed byArchitalcan, BCIN-registered, while the whole building stays within 3 storeys and 600 m² with no restaurant in it. Past that, an architect.

Structure
Beams, columns, footings, slabs and any new opening in a wall
Designed byA professional engineer, or a designer registered in Building Structural.
This page
Heating, cooling and ventilation
Rooftop units, ductwork, exhaust and energy efficiency
Designed byA professional engineer, or a designer registered in Building Services. Architalcan's HVAC class covers houses only.

Sprinklers and fire alarm
Sprinkler piping, alarm and detection
Designed byEngineers, or designers registered for that work: Fire Protection; Detection, Lighting and Power.

Plumbing
Washrooms, drains and water supply
Designed byAn engineer, or a designer registered in Plumbing – All Buildings.

Lighting and power
Lighting, emergency power and the electrical service
Designed byAn engineer, or a designer registered for that work.
What does it cost?
Permit and design fees for HVAC work: the City's, the HVAC designer's, and ours.
Paid to the City of Toronto
- HVAC filed with the building permit, City fee
- No extra fee
- When the HVAC goes in with the building permit application, Toronto Building charges nothing more for it unless there is a specialty system, a term its Related Mechanical (HVAC) guide does not define; ask Toronto Building whether a kitchen exhaust, spray booth or dust collector counts.
- Stand-alone HVAC permit, offices and shops, City fee
- $1.55/m²
- 2026, for offices, shops and other Group D and E uses. Assembly uses, institutions and restaurants $1.91/m²; an industrial building up to 230 m² a flat $231.97, a larger one $1.07/m² (laboratories $1.91/m², parking garages $0.40/m²). The City's minimum for any permit is $214.79 (Toronto Building fees page).
- HVAC alteration, City fee
- $214.79
- 2026 flat fee for adding a unit heater, make-up air unit (a unit that brings in heated outdoor air to replace air that is exhausted) or exhaust fan, or for altering ductwork. Replacing a boiler, furnace or air-conditioning unit is a flat $386.62.
- Special ventilation system, City fee
- $463.95
- 2026 flat fee for a commercial kitchen exhaust, spray booth, dust collector or similar system.
Paid to Architalcan
- Building drawings and coordination, our fee
- In writing
- Quoted after the building and use check, from the address, the building's size and the HVAC work planned.
Paid to the engineer or other designer
- HVAC design (engineer or Building Services designer) and roof structure
- Quoted separately
- The professional engineer or Building Services designer prices the heating, cooling and ventilation design, and a professional engineer or Building Structural designer any roof structure, each on their own line.
Who will draw it?
Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

“Read all 273 on HomeStars (opens in a new tab)Renovation of a semi in Toronto
Rocco was efficient and effective. He worked closely with us to ensure the design meets our needs and recommended valuable solutions that we previously weren't aware of. We got the permit within a reasonable amount of time despite submitting it just before the holidays.
- Registration
- BCIN 25897 – 41741 Look up the BCIN
- Classes
- House · Small Buildings · Large Buildings · HVAC-House
- On the drawings
- The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
How do I start?
Get a written quote for the building drawings around your HVAC work.
2842 Bloor St W, Unit 10, Etobicoke
Questions before you send it
Can you design the HVAC for my shop, office or industrial unit?
No. Ontario's public registry (QuARTS, checked October 30, 2026) lists the firm's classes as House, Small Buildings, Large Buildings and HVAC-House. HVAC-House covers heating, cooling and ventilation in a house; in a shop, office or industrial building those systems follow Part 6 of the Building Code and belong to the Building Services class, which the firm does not hold. A professional engineer or a Building Services designer designs and signs them. We check who may design the work, draw the building around it where the Architects Act lets us (a whole building, after the work, of up to 3 storeys and 600 m² gross area with no restaurant or other assembly use: s. 11(3)(a)), and coordinate their drawings and ours into one permit set.
Do I need a permit to replace a rooftop unit?
Expect one. Toronto Building's “When Do I Need a Building Permit?” page lists installing or modifying heating systems among the work that needs a permit, and its examples of work that needs none, replacing a furnace or boiler or adding cooling, apply only in a house. The City's 2026 stand-alone HVAC fees include a flat $386.62 for replacing a boiler, furnace or air-conditioning unit. If the new unit is heavier, larger or in a new spot, a professional engineer (or, in a building small enough not to need one, a Building Structural designer) checks the roof structure, and the zoning limits on rooftop equipment apply.
Does the size of the building change who designs the HVAC?
Yes. Where the whole building, after the work, has no more than 3 storeys and 600 m² of floor area on all its floors above ground, is used for business, personal services, shops or industry, and does not house an engineered process, the Professional Engineers Act does not require an engineer, so a designer registered in Building Services may design the HVAC. A bigger building needs a professional engineer. The test is the whole building, so a 150 m² unit in a 2,000 m² plaza is usually over the line; only a firewall with no access opening or building service through it lets the area be measured to that wall. A restaurant, bar or other assembly use anywhere in the building also takes it outside the exception. The Architects Act draws nearly the same line around our part: past those limits, or with a restaurant or other assembly use in the building, the roof plan, screens, shafts and fire separations are an architect's work (an architect's or engineer's in an industrial building), and we draw only interior work that leaves the structure, fire separations, exits and exterior walls unchanged.
What does the City charge for the HVAC permit?
If the HVAC goes in with a building permit application, nothing extra unless there is a specialty system. On its own it is a stand-alone mechanical permit: in 2026, $1.55/m² for offices and shops, flat fees from $214.79 for smaller jobs such as an added unit heater or exhaust fan, and $463.95 for a kitchen exhaust, spray booth or dust collector. Our fee and the HVAC designer's are separate.
My tenant is opening a restaurant and needs a kitchen exhaust hood. Who designs it?
A professional engineer. The Building Code requires the ventilation for commercial cooking equipment to meet NFPA 96, the standard for ventilation and fire protection in commercial kitchens. The Professional Engineers Act counts eating or drinking as an assembly use, and its small-building exception does not cover assembly, so in a building with a restaurant the engineering, the kitchen exhaust included, is a professional engineer's at any size. On its own the exhaust is a $463.95 special ventilation permit (2026). The Architects Act treats the restaurant the same way: its design needs an architect or, for a restaurant for up to 100 people in a building of up to 3 storeys and 600 m² gross area, an OAA Licensed Technologist. Its exception for interior work covers only work that touches no structure, fire separation, main entrance, public corridor, exit or exterior wall and adds no floor space. We can tell you which applies before anything is drawn.
Do you design HVAC for houses?
Yes. That is what the firm's HVAC-House class covers: heating, cooling and ventilation designed to Sections 9.32 and 9.33 of the Building Code for a house of up to two dwelling units, where each system serves one dwelling unit (or is radiant heating in a house with a secondary suite), drawn into the same permit set as an addition, a basement apartment or a new home. One forced-air system shared by both units falls under Part 6 instead, outside that class.
Who signs the HVAC drawings?
Whoever designs them. A professional engineer seals theirs; a Building Services designer's drawings carry their name, registration and qualification numbers, signature and a statement taking responsibility, and they file Schedule 1 (Designer Information) with the application. Our drawings carry BCIN 25897 – 41741 the same way. Where the Building Code calls for an architect's or engineer's review on site, the architect or engineer and the owner (or the owner's agent) sign the Commitment to General Reviews, the form in which the architect or engineer agrees to review the work as it is built.
Often done together
Commercial interior alterationsInterior alterations for offices, shops and other commercial spaces, drawn for permit.
Industrial unit alterationsAlterations to industrial units, drawn for permit with the engineers coordinated.
IndustrialUnit alterations, additions and new buildings up to 3 storeys and 600 m², with the engineers coordinated.