Commercial interior alterations in Toronto. Office and shop fit-outs.

We design tenant fit-outs and other interior alterations for offices, shops and other commercial spaces: partitions, washrooms, ceilings and finishes, drawn for the permit. In a building over 3 storeys or 600 m², work that touches the structure, exits or fire separations needs an architect, so we check the whole building first.

In four numbers

The City's 2026 fee for an office fit-out, per m² of the space altered; $11.53 for a shop.toronto.ca (opens in a new tab)
$12.45/m²
The largest office or shop fit-out Toronto's Express Services take; 300 m² for assembly and industrial space.toronto.ca (opens in a new tab)
600 m²
The City's goal for an Express examiner's review, once the application is complete.toronto.ca (opens in a new tab)
3 days
Rebuild walls or floors in a suite bigger than this, at grade or reached by elevator, and it must meet the Code's barrier-free rules (buildings five years or older).ontario.ca (opens in a new tab)
300 m²

Does this sound like my property?

Most fit-outs start with one of these.

If one sounds like yours, say so in your request, and Rocco starts from there.
  • Stock photo of new steel-stud partitions framed inside an older commercial building during a fit-out

    A newly leased unit

    You have leased an office or shop unit and need permit drawings for new partitions, washrooms and finishes.

  • Stock photo of a large empty commercial unit with taped drywall walls and ceiling, a steel beam and a roll-up door

    Splitting or joining units

    You are splitting one unit into two, or joining two, and need to know what the wall between them must be.

  • Stock photo of a long open-plan office with rows of desks under a high black ceiling and hanging lights

    More people in the space

    More people will work in the space than before, and you need to know whether washrooms and exits must grow with them.

  • Stock photo of a white office corridor with exposed ductwork and pipes along the ceiling

    A unit in a larger building

    Your unit is in a plaza or office building of more than three storeys or 600 m² gross area (all floors above ground together), and you need to know what can be drawn without an architect.

  • Stock photo of an empty café with wooden tables and yellow chairs around a concrete column, under an exposed industrial ceiling

    A café or restaurant

    You are thinking of opening a café or restaurant and want to know first what that changes.

Does my project need an architect?

It depends on the size and use of the whole building.

Ontario's Architects Act sets the line at 3 storeys and 600 m², counting every floor above ground of the whole building after the work, not just your unit.
Stock photo of a one-storey brick office building with dark windows beside its parking lot

No architect needed

We design it

  • A building of up to 3 storeys and 600 m², used for offices, services or shops.
  • Interior work in a building of any size, when it leaves the structure, fire separations, exits, the main entrance and outside walls alone, and adds no floor space.
Stock photo of a five-storey office building in dark brick and glass above a landscaped entrance

Past the line

An architect designs it

  • A building of more than 3 storeys or 600 m².
  • A restaurant or bar, beyond the interior work. For up to 100 people, in a building within the line, an OAA Licensed Technologist may design it instead.

Not sure which side yours is on? We check it from the survey before any drawing starts.

Ask us to checkArchitects Act, s. 11 (opens in a new tab)

What will it take?

What the City and the Architects Act ask of a fit-out, and what we draw.

The rules in plain English, each linked to its source, then every sheet in the set and each step from start to finish.

In short

  • Whether the work needs an architect, checked first against the whole building and what the work touches
  • Sprinkler, HVAC, plumbing and electrical engineers coordinated into one set
  • Our fee quoted in writing; City fees listed separately
Stock photo of an empty office floor with carpet, square columns and a wall of windows

Toronto Building charges an interior alteration by the square metre of “the actual space receiving the work”, measured to the outer face of exterior walls and the centre line of demising walls (the walls between tenants). In 2026 that is $12.45/m² for offices and other business and personal services space (the Building Code's Group D) and for assembly space such as restaurants (Group A), and $11.53/m² for shops and other mercantile space (Group E), which can include a restaurant for 30 people or fewer that the Code lets be classed as mercantile.

toronto.ca · Toronto Building: Interior Alterations (Non-Residential) guide (opens in a new tab)

Who designs which part?

One permit set, with the right designer on every part.

On a commercial or industrial building, the Building Code and the Architects Act decide who may design each part. We draw the building where the law allows it, then fold the engineers' drawings into one set the City reviews together.
  • Stock photo of a pencil sketch of a building on paper, with markers and tape on a wooden deskOur part

    The building

    Layout, walls, exits, fire separations and the outside of the building

    Designed byArchitalcan, BCIN-registered, while the whole building stays within 3 storeys and 600 m² with no restaurant in it. Past that, an architect.

  • Stock photo of red steel beams and columns of a building frame against a pale sky

    Structure

    Beams, columns, footings, slabs and any new opening in a wall

    Designed byA professional engineer, or a designer registered in Building Structural.

  • Stock photo of a rooftop heating and cooling unit and two small condensers on a flat roof with a ladder and patches of snow

    Heating, cooling and ventilation

    Rooftop units, ductwork, exhaust and energy efficiency

    Designed byA professional engineer, or a designer registered in Building Services. Architalcan's HVAC class covers houses only.

  • Stock photo of red sprinkler pipes hung beneath the dark roof of a building under construction

    Sprinklers and fire alarm

    Sprinkler piping, alarm and detection

    Designed byEngineers, or designers registered for that work: Fire Protection; Detection, Lighting and Power.

  • Stock photo of two copper water pipes running up inside an opened wall

    Plumbing

    Washrooms, drains and water supply

    Designed byAn engineer, or a designer registered in Plumbing – All Buildings.

  • Stock photo of an electrical room lined with switchgear cabinets on both sides of a narrow aisle

    Lighting and power

    Lighting, emergency power and the electrical service

    Designed byAn engineer, or a designer registered for that work.

What does it cost?

Permit and design fees for an interior alteration: the City's, and ours.

The City's bill, ours and the engineer's, kept apart. The City's fees follow its published 2026 schedules and are paid when each application is filed. Ours is quoted in writing; an engineer's or consultant's fee, where one is needed, is quoted on its own.

Paid to the City of Toronto

Interior alteration permit, offices
$12.45/m²
2026 City rate for business and personal services space (Group D), per m² of the area receiving the work; assembly space (Group A) pays the same rate. Example: a 200 m² office fit-out is 200 × $12.45 = $2,490.
Interior alteration permit, shops
$11.53/m²
2026 City rate for mercantile space (Group E), per m² of the area receiving the work.
Minimum City permit fee
$214.79
2026 minimum charged for all work: it covers up to about 17 m² of office work or 18.6 m² of shop work.
Plumbing filed with the fit-out, City fee
No extra fee
Plumbing filed with the building permit application carries no additional City fee (2026). A stand-alone plumbing permit is $30.94 per fixture in buildings other than single-family dwellings.
Zoning Applicable Law Certificate, City fee
$888.14
2026 fee for new buildings, additions and alterations to a building other than a house, up to 300 m²; $1,863.82 over 300 m². Credited against the permit fee when the permit application is filed with the certificate and the City's Declaration Form – Use of Zoning Applicable Law Certificate, within a year of the certificate's issue.
Work started before the permit, City surcharge
+50%
Half the permit fee or $214.79, whichever is greater, up to $29,456.99 per permit (2026).

Paid to Architalcan

Design and permit set, our fee
In writing
Quoted in writing for your project. Fees of any engineers the systems need are quoted on their own.

Who will draw it?

Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

Where the law requires an architect or engineer, they design and seal that work. Rated 5.0 from 273 reviews on HomeStars.
Rocco Schipano holding the HomeStars Best of the Best 2023 award

Renovation of a semi in Toronto

Rocco was efficient and effective. He worked closely with us to ensure the design meets our needs and recommended valuable solutions that we previously weren't aware of. We got the permit within a reasonable amount of time despite submitting it just before the holidays.

HomeOwner · Jan 17, 2025
Read all 273 on HomeStars (opens in a new tab)
Registration
BCIN 25897 – 41741 Look up the BCIN
Classes
House · Small Buildings · Large Buildings · HVAC-House
On the drawings
The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
About Rocco and the firm

How do I start?

Get a written quote for your fit-out.

Send the address, what the space is used for now and what it will be, the unit's area, the building's size and number of storeys if you know them, and the landlord's floor plan if you have one. Rocco checks the building and the zoning and replies in writing with what the work needs and a quote.

Step 2 of 3 · Property

Project:Commercial

Where is the property?
Do you have a property survey?

A survey lets us confirm setbacks and buildable area from the start. No survey? We'll tell you how to get one.

BCIN registered · Insured · 20+ years in Toronto

Questions before you send it

Do I need a building permit for new partitions in my unit?

Yes. Toronto Building lists adding or removing walls (changing room sizes or uses) among the work that needs a building permit, along with installing or modifying heating or plumbing. Its Interior Alterations (Non-Residential) guide covers interior work in an existing building where the floor area does not increase, including work that changes the use. Starting before the permit adds a City surcharge of half the permit fee, at least $214.79.

Do I need an architect for my office or shop fit-out?

It depends on the whole building, not your unit. In a building of up to three storeys and 600 m² gross area (every floor above ground, measured to the outside walls) used only for offices, shops, personal services, homes or industry, with no restaurant, bar or other assembly or institutional use in it, the Architects Act does not require an architect. In a bigger one, the Act does not require an architect to design interior work that does not affect, and is not likely to affect, the structure, fire separations or fire safety systems, the main entrance or public corridors, exits to the outside or exterior walls, and adds no mezzanine, infill or similar floor space. Beyond that, the work needs an architect's design (or a design prepared under an architect's personal supervision and direction), with an engineer for the engineering. In a bigger building the Building Code may still call for an architect's and an engineer's general review (site reviews during construction) of interior work, which we confirm with the City for each building. Under the Building Code Act, the City's chief building official issues a permit unless, among other things, the law requires an architect's or engineer's design and the work was not so designed. We check all of this before any drawing starts.

Does the wall between my unit and the next one need a fire rating?

For shops and most other suites, yes. In a Part 9 building (up to three storeys, with no floor footprint over 600 m²) the Building Code asks for a fire separation of at least 45 minutes between suites; in a larger, Part 3 building, at least 1 hour (45 minutes in some). The rule leaves out business and personal services suites such as offices, and in a sprinklered building, offices and shops served by a public corridor built to the Code's standard need no separation from each other. In a building over three storeys or 600 m² gross area (all floors above ground together, not just the footprint), work that affects or is likely to affect a fire separation falls outside the Architects Act's interior exception and needs an architect.

How many washrooms does my space need?

The Building Code counts water closets from the number of people a space is designed for. In an office (Group D) it counts one person per 14 m² of floor area, then asks for one water closet per sex for up to 9 people of that sex, two for 10 to 24 and three for 25 to 49; an office for 10 people or fewer may share one. A shop counts staff and public separately. A shop of 600 m² or less (not counting basements) needs no more than one public water closet per sex, and one of 300 m² or less, or for nine people or fewer, may share a single water closet. In a building at least five years old, if the work raises the building's occupant load by more than 15%, washrooms and ventilation must meet the new load, and the building is evaluated and its early warning and evacuation systems (how people are alerted to a fire and get out) upgraded. A smaller increase can also trigger that upgrade if the new load is more than 15% above the load at which the Code requires a fire alarm, or above the existing exit capacity.

I want to open a café or restaurant in a former shop or office. What changes?

Two things. The Building Code lists a change from an office or shop to a restaurant (Group A-2) among the changes of use that need a permit; when the alteration permit includes the new use, it covers that. And the Architects Act counts “the consumption of food or drink” as assembly: beyond interior-only work within its interior exception, the design needs an architect, or work prepared under an architect's personal supervision and direction. For a restaurant for up to 100 people in a building of up to three storeys and 600 m² gross area, an OAA Licensed Technologist may design it instead. The Building Code's general review table also lists every building with an assembly use (unless the only other use is industrial) for an architect's and an engineer's general review (site reviews during construction). Express Services do not take a change in use. Our change of use page covers the permit side.

Does a fit-out need site plan approval?

The City of Toronto Act puts interior design, and the layout of interior areas other than certain public walkways, stairs, elevators and escalators, outside site plan control. Where an interior alteration converts space to a new use the zoning already permits, the City's by-law exempts it up to 1,000 m² of altered floor area, unless it includes a place of assembly, an entertainment place of assembly, a place of worship, a drive-through or a transportation use. The City can still require site plan approval in some cases, for example where the Official Plan calls for a road widening, or where the Chief Building Official finds safety, accessibility or entrance-access matters to secure.

How long does the City take?

Toronto's own targets, once an application is complete: an examiner's review within three days for Express Services, 15 business days in the Small Building Stream (Part 9 buildings other than houses), and in the Large & Complex Building Stream (Part 3) 20 business days for large buildings and 30 for complex ones. The City counts an application in those streams without an issued ZAP as incomplete, and incomplete applications have no time frame.