Commercial · New buildings

New commercial buildings in Toronto, up to three storeys and 600 m².

We design new commercial buildings of up to 3 storeys and 600 m² across all floors, from the zoning review to the permit drawings, with the engineers coordinated into one set. Bigger buildings, and any with a restaurant or other gathering use, need an architect; we tell you before design starts.

In four numbers

The whole building, every floor above ground. Past it, or past 3 storeys, an architect designs it.ontario.ca (opens in a new tab)
600 m²
The City's 2026 permit fee for a finished office or clinic; $20.77 for a shop.toronto.ca (opens in a new tab)
$24.46/m²
The City's development charge, on the ground floor's non-residential area only.toronto.ca (opens in a new tab)
$805.64/m²
Of the land, or cash in lieu, for parkland, paid before the first above-grade permit.toronto.ca (opens in a new tab)
2%

Does this sound like my property?

Most new commercial buildings start with one of these.

If one sounds like yours, say so in your request, and Rocco starts from there.
  • Stock photo of a brick office building with rows of windows in low afternoon sun

    A small office, clinic or shop

    You own a commercial lot and want a small office, outpatient clinic or shop building of one to three storeys.

  • Stock photo of a three-storey red-brick commercial building on a street corner, with large ground-floor shop windows on an overcast day

    Shops with apartments above

    You want shops at street level with a few apartments above, and need to know whether site plan approval applies.

  • Stock photo of a hand on a mouse beside a marked-up drawing, a pen and a calculator on a desk

    Close to the architect line

    Your sketch is close to 600 m² or three storeys, and you need to know which side of the architect line it falls on.

  • Stock photo of a concrete building being knocked down, its walls and floors collapsing into rubble

    Replacing an old building

    You are replacing an old commercial building on the lot and want to know what the zoning allows now, and what the development charges will be.

Does my project need an architect?

It depends on the size and use of the whole building.

Ontario's Architects Act sets the line at 3 storeys and 600 m², counting every floor above ground of the whole building after the work, not just your unit.
Stock photo of a one-storey brick office building with dark windows beside its parking lot

No architect needed

We design it

  • A building of up to 3 storeys and 600 m², used for offices, services or shops.
  • Interior work in a building of any size, when it leaves the structure, fire separations, exits, the main entrance and outside walls alone, and adds no floor space.
Stock photo of a five-storey office building in dark brick and glass above a landscaped entrance

Past the line

An architect designs it

  • A building of more than 3 storeys or 600 m².
  • A restaurant or bar, beyond the interior work. For up to 100 people, in a building within the line, an OAA Licensed Technologist may design it instead.

Not sure which side yours is on? We check it from the survey before any drawing starts.

Ask us to checkArchitects Act, s. 11 (opens in a new tab)

What will it take?

What the law and the City require for a new commercial building, and what we design.

The rules in plain English, each linked to its source, then every sheet in the set and each step from start to finish.

In short

  • Which side of the architect line your building falls on, three storeys and 600 m², counted before design starts
  • Site plan, the Toronto Green Standard and development charges set out from the zoning review
  • Our fee quoted in writing; City fees and the engineers' quotes listed separately
Stock photo of a red steel frame for new storeys rising above an existing concrete floor

The Architects Act lets a designer who is not an architect design a new building for business, personal-service or retail use, alone or with apartments, only if it is no more than three storeys and no more than 600 m² in gross area (every floor above grade, measured to the outside of the exterior walls). Past either limit, an architect must design it and an engineer must do the engineering. Restaurants, bars and other places where people gather are assembly uses, which this exemption does not cover at any size.

ontario.ca · Architects Act, ss. 11(3)(a), 11(4) and 11(6) (e-Laws) (opens in a new tab)

Who designs which part?

One permit set, with the right designer on every part.

On a commercial or industrial building, the Building Code and the Architects Act decide who may design each part. We draw the building where the law allows it, then fold the engineers' drawings into one set the City reviews together.
  • Stock photo of a pencil sketch of a building on paper, with markers and tape on a wooden deskOur part

    The building

    Layout, walls, exits, fire separations and the outside of the building

    Designed byArchitalcan, BCIN-registered, while the whole building stays within 3 storeys and 600 m² with no restaurant in it. Past that, an architect.

  • Stock photo of red steel beams and columns of a building frame against a pale sky

    Structure

    Beams, columns, footings, slabs and any new opening in a wall

    Designed byA professional engineer, or a designer registered in Building Structural.

  • Stock photo of a rooftop heating and cooling unit and two small condensers on a flat roof with a ladder and patches of snow

    Heating, cooling and ventilation

    Rooftop units, ductwork, exhaust and energy efficiency

    Designed byA professional engineer, or a designer registered in Building Services. Architalcan's HVAC class covers houses only.

  • Stock photo of red sprinkler pipes hung beneath the dark roof of a building under construction

    Sprinklers and fire alarm

    Sprinkler piping, alarm and detection

    Designed byEngineers, or designers registered for that work: Fire Protection; Detection, Lighting and Power.

  • Stock photo of two copper water pipes running up inside an opened wall

    Plumbing

    Washrooms, drains and water supply

    Designed byAn engineer, or a designer registered in Plumbing – All Buildings.

  • Stock photo of an electrical room lined with switchgear cabinets on both sides of a narrow aisle

    Lighting and power

    Lighting, emergency power and the electrical service

    Designed byAn engineer, or a designer registered for that work.

What does it cost?

Fees and charges for a new commercial building: the City's, the engineers' and ours.

The City's bill, ours and the engineer's, kept apart. The City's permit fees follow its published 2026 schedules and are paid when each application is filed; development charges and parkland are due before the building permit is issued. Ours is quoted in writing; an engineer's or consultant's fee, where one is needed, is quoted on its own.

Paid to the City of Toronto

Building permit, office or clinic
$24.46/m²
2026 City rate for a finished office, bank, medical clinic or other business and personal-service building, times the floor area. Minimum $214.79. Example: 500 m² is $12,230.
Building permit, shops
$20.77/m²
2026 City rate for a finished store or other retail building; $15.76/m² for a retail shell, whose units are then finished under interior alteration permits ($11.53/m² for retail in 2026).
Building permit, apartments above
$18.56/m²
2026 City rate for the apartment floors of a mixed building, plus $56.33 for each new unit. The apartments also carry the City's residential development charges per unit (with exemptions for small developments) and the school board's charge per unit ($3,893 until December 2, 2026); see the City's rates.
Zoning Applicable Law Certificate
$1,863.82
2026 City fee for a new building other than a house over 300 m²; $888.14 at 300 m² or less. Up to three reviews; credited against the permit fee when the permit application is filed with it and the City's declaration form.
Development charges
$805.64/m²
City charge on the non-residential floor area on the ground floor only, at the rate in force since June 26, 2025 (not indexed in 2026), paid when the first building permit is issued. Example: a 250 m² ground floor is $201,410.
Education development charge (TCDSB)
$1.67/sq ft
Toronto Catholic District School Board charge on non-residential gross floor area (about $17.98 per m²), collected by the City with the first building permit for above-ground construction; $1.77 per sq ft (about $19.05 per m²) from December 3, 2026.
Parkland dedication
2% of the land
For non-residential development the City takes 2% of the land, or cash in lieu of it, paid before the first above-grade building permit; apartments raise the share for their floor space (Municipal Code §§ 415-22 and 415-24).
Site plan application
City Planning's fee
Where the building needs site plan approval, City Planning charges its own application fee under Municipal Code Chapter 441. It is not listed here.

Paid to Architalcan

Design and permit set, our fee
In writing
Quoted in writing for your project. City fees and charges, and each engineer's quote, are separate.

Paid to the engineer or other designer

Engineers' drawings
Their own quote
Each engineer or registered designer (structure, heating and ventilation, plumbing, electrical and, where the building needs them, sprinklers) quotes their own part.

Who will draw it?

Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

Where the law requires an architect or engineer, they design and seal that work. Rated 5.0 from 273 reviews on HomeStars.
Rocco Schipano holding the HomeStars Best of the Best 2023 award

Renovation of a semi in Toronto

Rocco was efficient and effective. He worked closely with us to ensure the design meets our needs and recommended valuable solutions that we previously weren't aware of. We got the permit within a reasonable amount of time despite submitting it just before the holidays.

HomeOwner · Jan 17, 2025
Read all 273 on HomeStars (opens in a new tab)
Registration
BCIN 25897 – 41741 Look up the BCIN
Classes
House · Small Buildings · Large Buildings · HVAC-House
On the drawings
The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
About Rocco and the firm

How do I start?

Get a written quote for your new commercial building.

Send the address, the uses you have in mind and roughly how big the building should be. Rocco replies in writing with what the project needs and a quote.

Step 2 of 3 · Property

Project:Commercial

Where is the property?
Do you have a property survey?

A survey lets us confirm setbacks and buildable area from the start. No survey? We'll tell you how to get one.

BCIN registered · Insured · 20+ years in Toronto

Questions before you send it

Do I need an architect for a new commercial building?

Not if it stays inside the Architects Act's small-building exemption: no more than three storeys and no more than 600 m² of gross area, used for business, personal services or retail, alone or with apartments. Gross area counts every floor above grade, measured to the outside of the exterior walls (or to the centre line of a firewall that no access opening or building service passes through). A basement below grade does not count, but on a sloping lot a walk-out lower floor can, because the Act takes grade from the lowest side of the building. Past either limit, an architect must design the building and an engineer the engineering; a designer who is neither may work on its design only under the personal supervision and direction of a member of the Ontario Association of Architects. We count the area at the zoning review, before design starts.

Why can a Part 9 building still need an architect?

The two laws measure differently. The Building Code's Part 9 (its rules for small buildings) looks at building area, the largest floor footprint: up to 600 m², and up to three storeys. The Architects Act adds up every floor above ground. A three-storey office of 300 m² a floor is a Part 9 building, but its 900 m² of gross area is past the Act's 600 m² limit, so it needs an architect.

Will my new commercial building need site plan approval?

Plan on it. Chapter 415 lists no exemption for a new stand-alone office, clinic or retail building. The exemptions that could fit are narrow: a mixed-use building with 10 dwelling units or fewer, non-residential uses at grade, no more than six storeys, no drive-through, entertainment place of assembly, medical office, place of assembly or place of worship, and no use the zoning permits only with conditions other than a retail store; or an ancillary building under 100 m² serving a non-residential building. Even an exempt project needs approval where the Official Plan requires the street or lane beside it to be widened, or where the Chief Building Official, with the City's Executive Director of Development Review, finds it would benefit on health, safety, accessibility, neighbouring-land or entrance-access matters not already secured by a minor variance or consent condition. The City may also require it within 300 m of a railway line (abandoned lines and lines used only by urban transit do not count), or within 120 m of a wetland, the Great Lakes shoreline, an inland lake or a river or stream valley.

What does the Toronto Green Standard ask of a small commercial building?

Tier 1 is checked through a planning application, such as site plan, and Version 4 covers every commercial development. Since Bill 98 in 2026, City Planning treats the greenhouse-gas and energy limits, EV charging, green and cool roofs and several landscaping measures as voluntary for private development; stormwater, waste storage, trees and soil volume, weather protection and pedestrian lighting stay required, and bird-friendly glass is kept for now, pending a further review. Meeting a higher tier (2 to 4), together with every Tier 1 measure including the interim voluntary ones, can earn back part of the development charges.

How are development charges worked out?

The City's charge falls on the ground floor only. Toronto charges $805.64 per m² of non-residential floor area on the ground floor, paid when the first building permit is issued, so a 250 m² ground floor is $201,410, and offices or shops on upper floors add no City development charge. If a demolition permit for a legally established non-residential building on the lot was issued within 36 months before a complete permit application, the new ground-floor area that replaces its ground floor is not charged, up to the charge that would otherwise apply. The school board's education development charge and, for apartments, the City's residential charges per unit are separate.

What else does the City collect on a new commercial building?

Besides the permit fee and its own development charge: the Toronto Catholic District School Board's education development charge, which the City collects with the first building permit for above-ground construction, at $1.67 per square foot of non-residential gross floor area until December 2, 2026 and $1.77 from December 3; parkland, where the City takes 2% of the land for non-residential development, or cash in lieu of it, before the first above-grade building permit; and, where site plan approval applies, City Planning's own application fee. Apartments above add the residential permit rate, $56.33 a unit, and residential development and education charges per unit.

Who designs the structure, heating and sprinklers?

Engineers, or designers registered for that work. Ontario's public registry lists the firm's classes as House, Small Buildings, Large Buildings and HVAC-House; the Small and Large Buildings classes leave out the Building Structural, Building Services and Plumbing classes. Heating, ventilation and air conditioning for a shop or office falls under Part 6 of the Building Code even in a small building, and HVAC-House covers houses only. Foundations that go below a neighbour's footings, and any underpinning, must be designed by a professional engineer. We coordinate their drawings with ours into one permit set.

Can you design a restaurant or café building?

No. The Architects Act counts eating and drinking as an assembly use, which its small-building exemption does not cover, so a restaurant building, or a new building with a restaurant unit, needs a professional engineer for the engineering and an architect for the design. For a restaurant of up to 100 people in a building of up to three storeys and 600 m² of gross area, a Licensed Technologist of the Ontario Association of Architects may design it instead of an architect. Tell us every use at the start.