Residential, commercial and industrial design

Stock photo of a three-storey red-brick commercial building on a street corner, with large ground-floor shop windows on an overcast day

Commercial · Design and permit drawings

Commercial design and permits in Toronto. Offices, shops and services.

We design fit-outs, changes of use and additions for offices, shops and service businesses, with the engineers coordinated into one permit set. Past 3 storeys or 600 m² for the whole building, or with a restaurant in it, most work needs an architect; we check that first.

In four numbers

The whole building after the work, every floor above ground. Past it, or past 3 storeys, an architect designs it.ontario.ca (opens in a new tab)
600 m²
The City's 2026 permit fee for an office fit-out, per m² altered; $11.53 for a shop.toronto.ca (opens in a new tab)
$12.45/m²
A Zoning Use Review: the City says whether a use is allowed at the address, no drawings needed.toronto.ca (opens in a new tab)
$214.79
An interior conversion to a use the zoning already permits can skip site plan approval up to this size, with exceptions.toronto.ca (opens in a new tab)
1,000 m²

Does this sound like my property?

Most shop and office projects start with one of these.

If one sounds like yours, say so in your request, and Rocco starts from there.
  • Stock photo of an empty office floor with carpet, square columns and a wall of windows

    A fit-out in a leased unit

    You lease an office, shop or studio unit and need permit drawings for the fit-out.

  • Stock photo of a brick office building with rows of windows in low afternoon sun

    A new storey or rear addition

    You own a small commercial building and want a new storey or a rear addition that keeps it within 3 storeys and 600 m² of floor area above grade.

  • Stock photo of a vacant commercial unit with bare concrete walls, pipes and ducts overhead and a lone office chair

    A new kind of business

    You want a different business in the space and need to know whether the zoning allows it and what the Building Code asks of the new use.

  • Stock photo of a white office corridor with exposed ductwork and pipes along the ceiling

    Moving heating, cooling or ventilation

    Your fit-out moves heating, cooling or ventilation, and the mechanical drawings have to match the rest of the set.

Does my project need an architect?

It depends on the size and use of the whole building.

Ontario's Architects Act sets the line at 3 storeys and 600 m², counting every floor above ground of the whole building after the work, not just your unit.
Stock photo of a one-storey brick office building with dark windows beside its parking lot

No architect needed

We design it

  • A building of up to 3 storeys and 600 m², used for offices, services or shops.
  • Interior work in a building of any size, when it leaves the structure, fire separations, exits, the main entrance and outside walls alone, and adds no floor space.
Stock photo of a five-storey office building in dark brick and glass above a landscaped entrance

Past the line

An architect designs it

  • A building of more than 3 storeys or 600 m².
  • A restaurant or bar, beyond the interior work. For up to 100 people, in a building within the line, an OAA Licensed Technologist may design it instead.

Not sure which side yours is on? We check it from the survey before any drawing starts.

Ask us to checkArchitects Act, s. 11 (opens in a new tab)

What will it take?

What a commercial project needs from the City and the law, and who designs each part.

The rules in plain English, each linked to its source, then every sheet in the set and each step from start to finish.

In short

  • Zoning, site plan and whether you need an architect, checked first
  • BCIN classes for this work: Small Buildings, and Large Buildings for interiors
  • Our fee in writing, apart from the City's and the consultants'
Stock photo of a one-storey red-brick commercial building with three tall steel-framed windows and a white garage door

Toronto Building lists the work that needs a permit: a new building or an addition, structural or material alterations such as moving walls or adding or enlarging windows and doors, installing or changing heating or plumbing, demolition, and a change of use. In any building other than a detached, semi-detached or row house with a single dwelling unit, even replacing a window or door in the same opening needs one. (The Building Code Act itself requires a change-of-use permit where the change increases the hazard under the Building Code.)

toronto.ca · Toronto Building: When Do I Need a Building Permit? (opens in a new tab)

Who designs which part?

One permit set, with the right designer on every part.

On a commercial or industrial building, the Building Code and the Architects Act decide who may design each part. We draw the building where the law allows it, then fold the engineers' drawings into one set the City reviews together.
  • Stock photo of a pencil sketch of a building on paper, with markers and tape on a wooden deskOur part

    The building

    Layout, walls, exits, fire separations and the outside of the building

    Designed byArchitalcan, BCIN-registered, while the whole building stays within 3 storeys and 600 m² with no restaurant in it. Past that, an architect.

  • Stock photo of red steel beams and columns of a building frame against a pale sky

    Structure

    Beams, columns, footings, slabs and any new opening in a wall

    Designed byA professional engineer, or a designer registered in Building Structural.

  • Stock photo of a rooftop heating and cooling unit and two small condensers on a flat roof with a ladder and patches of snow

    Heating, cooling and ventilation

    Rooftop units, ductwork, exhaust and energy efficiency

    Designed byA professional engineer, or a designer registered in Building Services. Architalcan's HVAC class covers houses only.

  • Stock photo of red sprinkler pipes hung beneath the dark roof of a building under construction

    Sprinklers and fire alarm

    Sprinkler piping, alarm and detection

    Designed byEngineers, or designers registered for that work: Fire Protection; Detection, Lighting and Power.

  • Stock photo of two copper water pipes running up inside an opened wall

    Plumbing

    Washrooms, drains and water supply

    Designed byAn engineer, or a designer registered in Plumbing – All Buildings.

  • Stock photo of an electrical room lined with switchgear cabinets on both sides of a narrow aisle

    Lighting and power

    Lighting, emergency power and the electrical service

    Designed byAn engineer, or a designer registered for that work.

What does it cost?

Design and permit fees for a commercial project: the City's, ours and the consultants'.

The City's bill, ours and the engineer's, kept apart. The City's permit fees follow its published 2026 schedules and are paid when each application is filed; development charges and parkland are due before the building permit is issued. Ours is quoted in writing; an engineer's or consultant's fee, where one is needed, is quoted on its own.

Paid to the City of Toronto

Zoning Use Review, City fee
$214.79
2026, per request. Says whether a use is permitted at the address, without drawings; parking, loading, built form and any conditions attached to the use are not reviewed.
Zoning Applicable Law Certificate, City fee
$888.14
2026, for a new building, addition or alteration of up to 300 m²; $1,863.82 above 300 m². Up to three reviews. Not refunded once review has started (75% back if cancelled before any review). Credited against the permit fee when the certificate is filed with the application and the City's Declaration Form – Use of Zoning Applicable Law Certificate, with no refund where it exceeds the permit fee.
Interior alterations, City permit fee
$12.45/m²
2026, per m² of the space receiving the work, for offices and other business and personal services uses; $11.53/m² for shops. Minimum $214.79.
New building or addition, City permit fee
$24.46/m²
2026, for finished office space; $20.77/m² for a finished shop. Minimum $214.79.
Development charge, new ground-floor space
$805.64/m²
City rate since June 26, 2025, on new non-residential floor area on the ground floor only, paid when the first building permit is issued. Converting existing non-residential space to another non-residential use, with no demolition, adds none where the old use was legally established.
Education development charge (Catholic school board), collected by the City
$1.67/sq ft
On non-residential gross floor area, to Dec 2, 2026 (about $17.98/m²); $1.77/sq ft from Dec 3, 2026. Imposed with the first building permit for above-ground construction. Exemptions and how floor area is measured are set by the school board's by-law.

Paid to Architalcan

Design and permit set, our fee
In writing
Quoted after the zoning review, from the survey, the use and the scope.

Paid to the engineer or other designer

Engineers and other consultants
Quoted separately
Structural, mechanical, plumbing, electrical and sprinkler drawings are priced by whoever prepares them. Where the law requires an architect, the architect designs the building and quotes their own fee.

Who will draw it?

Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

Where the law requires an architect or engineer, they design and seal that work. Rated 5.0 from 273 reviews on HomeStars.
Rocco Schipano holding the HomeStars Best of the Best 2023 award

Renovation of a semi in Toronto

Rocco was efficient and effective. He worked closely with us to ensure the design meets our needs and recommended valuable solutions that we previously weren't aware of. We got the permit within a reasonable amount of time despite submitting it just before the holidays.

HomeOwner · Jan 17, 2025
Read all 273 on HomeStars (opens in a new tab)
Registration
BCIN 25897 – 41741 Look up the BCIN
Classes
House · Small Buildings · Large Buildings · HVAC-House
On the drawings
The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
About Rocco and the firm

How do I start?

Get a written quote for your commercial project.

Send the address, what the space is used for today and what you want it to be, and the building's size and number of storeys if you know them. Rocco checks the zoning, the site plan question and whether an architect is needed, and replies in writing with the drawings and consultants you need and a quote.

Step 2 of 3 · Property

Project:Commercial

Where is the property?
Do you have a property survey?

A survey lets us confirm setbacks and buildable area from the start. No survey? We'll tell you how to get one.

BCIN registered · Insured · 20+ years in Toronto

Questions before you send it

Do I need an architect for my commercial project?

It depends on the whole building, not your unit. For offices, personal services and shops, a designer who is not an architect may design the work only if, after it, the building has no more than 3 storeys and no more than 600 m² of floor area above grade, measured to the outside faces of the exterior walls, or to the centre line of a firewall that no access opening or building service passes through. Only floors above grade count (grade is the lowest of the average ground levels along each exterior wall), so most basements are left out, but a walk-out lower floor can count. A 200 m² unit in a 2,000 m² plaza is over the line unless a firewall of that kind separates it. So is any building that holds a restaurant, bar or other gathering place, whatever its size (for a small restaurant, see the next question). Over the line, an architect and an engineer design it; interior work that does not affect, and is not likely to affect, the structure, a fire safety system (such as sprinklers or the fire alarm) or fire separation, a main entrance or public corridor, an exit or an exterior wall, and adds no floor space such as a mezzanine, can still be drawn without an architect. In a building that size the Building Code may still call for an architect's and engineer's general review (site reviews during construction).

Can you design a restaurant, bar or café?

Not a new restaurant, and in a conversion to one only the interior work the Act allows without an architect. The Architects Act counts the consumption of food or drink as an assembly use, and a building used for assembly needs an architect and an engineer at any size; for a restaurant for up to 100 people in a building of no more than 3 storeys and 600 m², an OAA Licensed Technologist may design it instead. Turning a shop or office into a restaurant is a change to an assembly use, and where the work touches the fire separations, exits or anything else on the Act's list, the design comes from one of them. Inside an existing restaurant, interior work that does not affect, and is not likely to affect, the structure, a fire safety system or fire separation, a main entrance or public corridor, an exit or an exterior wall, and adds no floor space such as a mezzanine, can be drawn without an architect, as in any building, though the Building Code may still call for an architect's and an engineer's general review (site reviews) in an assembly building.

Who designs the structure and the heating, cooling and ventilation?

An engineer, or a designer registered in that class. Structural design is its own class under the Building Code, and heating, cooling and ventilation for a shop or office falls under Building Services, because it follows Part 6 of the Code even in a small building. Ontario's public registry (QuARTS) lists the firm's classes as House, Small Buildings, Large Buildings and HVAC-House, and HVAC-House covers houses only, so those drawings come from the engineer or designer who signs them, coordinated with ours.

Does my project need site plan approval?

It depends on the kind of work. The by-law lists no exemption for a new stand-alone commercial building. An addition to a commercial building under 600 m² outside the front yard can be exempt, and so can an interior conversion of up to 1,000 m² to a use the zoning already permits, if neither includes one of the uses the by-law excludes. Even then, approval is required where the Official Plan calls for a right-of-way widening (of the street or lane). The City can also require it where the Chief Building Official, with the Executive Director of Development Review, finds the work may benefit from review of its effects on adjoining lands, health, safety, accessibility or access to its entrances (unless a final minor variance or consent condition already secures it), or where it lies within 300 m of a railway line (not one used only by urban rail transit) or 120 m of a wetland, the Great Lakes shoreline, an inland lake or a river or stream valley.

Zoning Use Review or ZAP: which do I need?

The Zoning Use Review ($214.79 in 2026) answers one question, whether a use is permitted at the address, without drawings, and does not look at parking, loading, the building or the conditions attached to the use; drive-throughs, patios and uses not on its form go straight to the ZAP. The Zoning Applicable Law Certificate (ZAP) reviews the actual drawings against the zoning and other applicable law, with up to three reviews, and a permit application is not complete without it. Its fee ($888.14 up to 300 m², $1,863.82 above) is credited against the permit fee when the certificate is filed with the application within a year of being issued.

How long does the City take to review the permit?

Toronto Building's targets, for a complete application with an issued ZAP: 15 business days for a building within Part 9 of the Code (up to 3 storeys and 600 m² on its largest floor), 20 for a larger building under Part 3 (30 for a complex one). Interior alterations of up to 600 m² to offices, shops and restaurants with fewer than 30 seats, with no change of use or patron (customer) area, no active permit for the building's shell and no heritage approval needed, can go through Express Services, where the City says an examiner reviews an application sent with all the required documents within 3 days. These are the City's times, not ours.

Who signs the drawings?

Our drawings carry BCIN 25897 – 41741 with the designer's name, signature and statement of responsibility, as Toronto Building requires. Where the law calls for an architect or engineer, they design and seal their part and sign the Commitment to General Reviews, and the Building Code lets only an architect carry out the general review of work built to an architect's design, and only an engineer of work built to an engineer's design.