
Laneway suites · Toronto
Laneway suite design in Toronto, from lane check to permit.
If your lot meets a public lane for at least 3.5 m, Toronto allows a laneway suite at the back. We check the lane, separation and fire access from your survey, then design the suite and draw the permit set.
Does this sound like my house?
Most laneway suite projects start with one of these.
- Your rear lot line runs along a public lane and the old garage is on its last legs. You want a rental unit there instead.
- You own a semi on a lane, and a neighbour has already built a laneway suite.
- Your parents or your adult kids need a place of their own, and the lane behind the house gives it a front door.
- You have the City's free pre-approved laneway plan and need the site plan, zoning review and permit application that go with it.
- You are not sure whether your lot counts as laneway or garden-suite territory, and the answer changes the setbacks. The lane check further down this page settles it.
Is my lot laneway or garden-suite territory?
Laneway or garden suite? Four questions settle it.
Toronto runs two rule books for backyard suites, and the lane decides which one you are in. Answer four questions from your survey; the rule book your lot follows lights up, with the rule behind each answer.
Your answers can go with your request.
Look at the back and sides of the lot on your survey. A shared driveway is not a lane.
Measure the length of the rear (or side) lot line that touches the lane.
Back wall of the house to the rear lot line. The ranges follow the rule book you are in: laneway suites sit 1.0 m off the lane.
The suite must have less floor area than your house, so your house's size sets the suite's maximum.
Your result
Answer four questions from your survey; the rule book your lot follows lights up as you go.
0 of 4 answered

Laneway suite
Chapter 150.8

Garden suite
Chapter 150.7
A first check, not a zoning review. Lot coverage, soft landscaping, protected trees, easements and existing buildings also decide what fits. No lane on your survey? Garden-suite rules, the nine certified models and the lot check are on the garden suites page.
Sources (5)
- Zoning By-law 569-2013, Chapter 150.8 Laneway Suites (opens in a new tab)
- Zoning By-law 569-2013, Chapter 150.7 Garden Suites (opens in a new tab)
- City of Toronto: Garden Suites (opens in a new tab)
- City of Toronto: Expanding Housing Options in Neighbourhoods (opens in a new tab)
- Toronto Building: pre-approved garden and laneway suite plans (opens in a new tab)
What will it take?
What the City requires for a laneway suite, and what we design.
In short
- Lane frontage, distance from the house and the fire-access walk checked from your survey before we quote
- Architectural, structural and HVAC drawings from one office, under one BCIN
- Our fee quoted in writing; City permit fees listed separately, never marked up

A laneway suite needs a rear or side lot line that abuts a lane for at least 3.5 m (s. 150.8.30.20). Side and rear lot lines on the lane can add up to it. A lot may have a laneway suite or a garden suite, not both (s. 150.8.20.1).
toronto.ca · Zoning By-law 569-2013, Chapter 150.8 Laneway Suites (opens in a new tab)At least 4.0 m from the house if the suite is 4.0 m high or less. At least 7.5 m if it is taller, up to 6.3 m and two storeys (s. 150.8.60.30 and s. 150.8.60.40).
toronto.ca · Zoning By-law 569-2013, Chapter 150.8 Laneway Suites (opens in a new tab)Maximum building width 8.0 m and length 10.0 m (s. 150.8.60.30). The suite's gross floor area must be less than the house's, and it is excluded from the lot's floor space index (s. 150.8.60.50).
toronto.ca · Zoning By-law 569-2013, Chapter 150.8 Laneway Suites (opens in a new tab)Rear setback 1.0 m where the rear lot line is on a lane. A side wall with no openings can sit 0.0 m from a side lot line that does not abut a street or lane (s. 150.8.60.20). The City's quick reference for its pre-approved plans shows the same 1.0 m / 0.0 m.
toronto.ca · Toronto Building: pre-approved garden and laneway suite plans (opens in a new tab)With a laneway suite on the lot, no parking spaces are required for the suite or for the units in the house. Two bicycle parking spaces are required (s. 150.8.80.1).
toronto.ca · Zoning By-law 569-2013, Chapter 150.8 Laneway Suites (opens in a new tab)The standard rule is a walk of up to 45 m from the public street to the suite entry. Up to 90 m is accepted with Option 1 (automatic sprinkler, exterior strobe, alarms) or Option 2 (increased fire-protection construction, strobe, alarms). Access is measured from the street the house faces and is reviewed at the permit stage.
toronto.ca · Toronto Building: pre-approved garden and laneway suite plans (opens in a new tab)Chapter 150.8, line by line: the 3.5 m of lot line the lane must touch, the 4.0 m or 7.5 m separation and the height that goes with it. Then the 8.0 × 10.0 m envelope and the floor-area cap against your house.
From your survey: setbacks, separation, soft-landscaping percentages, two bicycle spaces and the fire-access route the examiner will measure.
Drainage that creates no new ponding on your lot or the neighbours', as Toronto Building (the City's permit office) requires for infill housing.
Floor plans, elevations and sections showing how close walls and windows can sit to the property line under the fire rules, smoke and CO alarm locations, stairs and guards.
Foundation (footings or screw-in steel piles), floor and roof framing. Truss and joist layouts where engineered systems are used.
Heat pump or forced air, with the heat-loss, heat-gain and duct calculations and the Mechanical (HVAC) Permit application.
The walk from the street is measured and drawn. Over 45 m, we prepare the Option 1 (sprinklers, strobe, alarms) or Option 2 (fire-rated construction, strobe, alarms) package and coordinate the sprinkler design.
Application to Construct or Demolish, Energy Efficiency Design Summary (SB-12), Schedule 1 Designer Information, the Tree Declaration and the road-damage declaration, and the declaration for the Residential Infill Public Notice posted on site. Filed as PDFs through Toronto Building's online Application Submission Tool. We answer every examiner comment.
- Survey in, lane check outBefore the quote
Email the survey, or send it on WhatsApp. We confirm how much of your lot line touches the lane and measure the rear yard and the fire-access walk. Then we tell you in writing what fits, and whether it is one storey or two.
- Pick the routeYour call
The City's free pre-approved laneway plan, placed on your lot with its own site plan, or a custom design sized to the envelope. Either way you get our fee in writing before we draw.
- Drawings, coordinatedSet in the quote
Site plan, grading, architectural, structural and HVAC from one office, so the details agree with each other and the examiner has nothing to chase.
- Submit and answerCity review
We file online and answer the fire-access review and every question from the City's examiner until the City decides.
- Build in a factory or on siteConstruction
Hand the City-approved drawings to your builder, or ask about factory-built panels. We stay available for site questions.
What does it cost?
Design and permit fees for a laneway suite: the City's, and ours.
Paid to the City of Toronto
- Building permit, City fee
- $18.56/m²
- Plus a $56.33 residential unit fee, effective January 1, 2026 (Toronto Building's laneway-suite fee table). A 60 m² suite is about $1,170 (estimate).
Paid to Architalcan
- Zoning review and lane check
- Included
- Done from your survey before we quote.
- Design and permit set, our fee
- In writing
- Priced by storeys and fire access. Covers the site plan, grading, architectural, structural and HVAC drawings.
- Fire-access package (Option 1 or 2)
- If needed
- Only when the walk from the street exceeds 45 m. Quoted before we draw.
- Minor variance package, if required
- In writing
- Drawings, the case and the hearing, quoted after the zoning review. The City's Committee of Adjustment application fee is separate and paid to the City.
Who will draw it?
Architalcan Design, led by Rocco Schipano, BCIN-registered designer.

“Read all 273 on HomeStars (opens in a new tab)Renovation of a semi in Toronto
Rocco was efficient and effective. He worked closely with us to ensure the design meets our needs and recommended valuable solutions that we previously weren't aware of. We got the permit within a reasonable amount of time despite submitting it just before the holidays.
- Registration
- BCIN 25897 – 41741 Look up the BCIN
- Classes
- House · Small Buildings · Large Buildings · HVAC-House
- On the drawings
- The designer's name, BCIN and signature, as Toronto Building requires; engineer-designed sheets carry the engineer's seal. Why the City asks (opens in a new tab)
How do I start?
Get a written quote for your laneway suite.
2842 Bloor St W, Unit 10, Etobicoke
Questions before you send it
Laneway suite or garden suite: what is the difference?
A laneway suite sits on a lot that abuts a public lane for at least 3.5 m and is generally accessed from the lane. A garden suite sits in a rear yard with no lane. They live in different chapters of the zoning by-law: Chapter 150.8 and Chapter 150.7. The setbacks differ: 1.0 m off the lane for a laneway suite; for a garden suite, 1.5 m from the rear lot line, or 3.0 m if upstairs back windows (more than 4.0 m up) face a neighbour's yard. A lot can have one or the other, never both.
How big can a laneway suite be?
Up to 8.0 m wide and 10.0 m long, two storeys at most. Height is 4.0 m if the suite is within 7.5 m of the house, or 6.3 m if it is 7.5 m or more away. Its gross floor area must be less than the house's, and the suite's floor area does not count toward the lot's floor space index.
Do I need a parking space for a laneway suite?
No. With a laneway suite on the lot, Chapter 150.8 removes the parking requirement for the suite and for the dwelling units in the house. Two bicycle parking spaces are required.
Can I use the City's free pre-approved laneway plan?
Yes. Since July 2025, the City has offered free “Made in Toronto” pre-approved plans for garden and laneway suites. A building permit is still required. Site-specific zoning, fire access and servicing are still reviewed. The set includes a Studio Laneway Suite and a Two-bedroom Laneway Suite. Each comes in heat-pump or forced-air versions and in three fire-access versions: 0 for a walk of up to 45 m from the street, and 1 (sprinklers, strobe, alarms) or 2 (fire-rated construction, strobe, alarms) for up to 90 m. You still file a full permit application with a site plan, grading plan and forms. Any change to the plan, including HVAC or plumbing, ends its pre-approved status. We prepare the site-specific package and handle the application.
What does the City charge for a laneway suite permit?
Toronto Building's laneway-suite guide lists $18.56 per m² for houses, semis, townhouses and duplexes. Each new unit adds a $56.33 residential unit fee. Both are effective January 1, 2026. The City's Certified Plans Program is a separate route: $9.29 per m² to certify a plan and $15.75 per m² for each permit that uses it. City fees are paid to the City at submission and are listed, not marked up, in your quote.
What is the fire-access rule, and can I get a variance from it?
Emergency access is measured from the street the house faces to the suite entry. Up to 45 m needs no extra fire-safety measures. Up to 90 m is accepted with sprinklers or fire-resistant construction, plus a flashing light outside and smoke alarms. The rule comes from the Ontario Building Code, not the zoning by-law. So it is checked at the building-permit stage and cannot be varied by the Committee of Adjustment. We measure it before we quote.
How much of the yard has to stay green?
Between the back of the house and the suite: at least 60% soft landscaping on lots 6.0 m wide or narrower, 85% on wider lots. A walkway up to 1.5 m wide is excluded. Between the suite and the lane: at least 75% soft landscaping, excluding the driveway and walkway (s. 150.8.50.10). The site plan shows every square metre.
My garage is already on the lane. Can it become the suite?
Chapter 150.8 lets a garage or shed that was built legally keep its current distances from the lot lines and the house. In the by-law, that generally means it was there legally on May 9, 2013, or had its permit by then. The structure, foundation and fire separation still have to meet the Building Code, so many garages end up rebuilt on the same footprint. We tell you which it is at the zoning review, from the survey and photos.
Laneway suites
Get a quoteGet a written quote

