Skip to content

Residential, commercial and industrial design

Basements

Legal basement apartment requirements in Toronto

What a legal basement apartment in Toronto needs in 2026: zoning, a 1.95 m ceiling, fire separation, interconnected alarms, a way out and a closed permit.

14 min readBy Rocco Schipano, ArchitalcanUpdated Nov 2, 2026
Basement being lowered around a brick pier

A basement apartment built in Toronto today is legal when three things line up: the zoning by-law allows a secondary suite in your house, the suite meets the Ontario Building Code, and a building permit for it has been issued, inspected and closed. The Fire Code applies on top of that from the day someone lives there.

Minimum ceiling in a suite, about 6'5"
1.95 m
Clear height under beams and ducts, about 6'1"
1.85 m
Of the home's interior floor area, the most a suite may take
45%
Type X drywall, one option between units in a newer house
15.9 mm

A house that was already used as two units on November 16, 1995 is a special case: the Planning Act keeps its second-unit rules of that time in force for that house (s. 76).

Zoning: can your house have a secondary suite?

Toronto's zoning permits a secondary suite in a detached house, a semi-detached house or a townhouse, one per dwelling unit (By-law 569-2013, s. 150.10.20.1). The by-law's name for a basement apartment is a secondary suite: a self-contained home with its own kitchen and bathroom, inside and subordinate to a dwelling unit. In some apartment, commercial and institutional zones, the house must already exist lawfully.

  • Size: no more than 45% of the interior floor area of the dwelling unit it sits in. In a one-storey detached house, a basement suite may take the whole basement (s. 150.10.40.40).
  • Parking: none required for a secondary suite (Table 200.5.10.1). A new space you add for the suite needs a marked, energized outlet capable of Level 2 EV charging (s. 200.5.1.10(14) and 200.5.200.5).
  • Entrance: since By-law 474-2023, zoning no longer limits front entrances for secondary suites. A new stair down to a side or rear door still goes through the zoning review, with its setbacks to the lot lines on the site plan.

Minimum ceiling height: the first number to check

The Building Code sets the ceiling in a secondary suite at no less than 1.95 m (about 6'5"), and the clear height under beams and ducts at no less than 1.85 m, about 6'1" (Div. B, 9.5.3.1). The part of each room that meets those heights has to connect to the room's entrance. An older house gets no allowance here: the Code's renovation relief for lower rooms leaves secondary suites out (Table 11.5.1.1.-C, C105).

A finished basement with pot lights, a wood-look floor and beams and ducts boxed in below the ceiling
Boxed-in beams and ducts like these need 1.85 m clear underneath.

How to measure

Measure from the floor to the underside of the joists, then under every beam and duct, and subtract the new floor finish and drywall ceiling. Ducts are often the lowest point, and many can be rerouted. Joists that are low everywhere, or a beam below 1.85 m that can't move, mean the floor comes down.

When the ceiling is too low: underpinning or benching

There are two ways to bring the floor down:

Underpinning

New footings are built under the existing ones in short, numbered stages, so the new floor runs wall to wall.

Benching

The footings are left alone and the new floor is poured lower inside a concrete ledge along the walls, which costs floor width.

Toronto Building sets these engineering rules for underpinning:

  • A Professional Engineer designs and reviews on site any underpinning that goes below a neighbouring building's footing within the soil's angle of repose, the steepest slope at which the soil stays stable.
  • Engineer design and site review also apply where more than 1.2 m (about 4 ft) of wall is left without lateral support, or where the soil is clay or silt.
  • On every underpinning job, an engineer must test and report on at least the first and last stages, or the inspections won't pass.
Underpinning pin dug under an existing basement wall with shoring
One underpinning stage: a pin dug under the existing wall, with shoring.
New underpinned basement wall sections poured in numbered stages
New wall sections poured in numbered stages.

It is also the moment to add a walkout, since the new stair lands at the new floor level. Our basement underpinning page covers the drawings and the engineer's part.

What the Ontario Building Code requires for the suite

Turning one home into two counts as a change of major occupancy, so the suite must meet the Code's rules for room sizes, heights, windows, plumbing fixtures, ventilation and electrical (Div. B, 11.4.2.3 and 11.4.3.4). In a house at least five years old, Part 11 applies, and its compliance alternatives can replace many Part 9 rules without special approval (Div. A, 1.3.3.3B; Div. B, 11.5.1.1). A newer house follows Part 9 as written.

Ontario Building Code for a house with a secondary suite (2024 Code)
ItemNew, or under 5 years5 years or older
Ceiling1.95 m; 1.85 m under beams and ductsSame; no relief for a suite
Floor between units45 min to 1 h, or 15.9 mm Type X below30 min, or 15 min with linked alarms
Walls between units45 min to 1 h, or 15.9 mm Type X both sides30 min
Furnace room1 h, or 15.9 mm Type X walls and ceilingCeiling 30 min; walls unrated with linked alarms
DoorsRated to suit the wall, self-closingExisting 45 mm solid-core or metal-clad
Smoke alarmsHard-wired, linked, with a visual signalBattery allowed; still linked
CO alarmsHard-wired and linkedBattery or plug-in
Escape window0.35 m², no side under 380 mmExisting, if a door leads outside
Window glassLiving and dining 10% of floor; bedroom 5%Half, if not an escape window
SoundSTC 50 or ASTC 47STC 43, ASTC 40 or a set assembly
HeatingNo ducts shared between unitsOne furnace with a duct detector
Room sizesBedroom 7 m² (one 9.8 m²); living 13.5 m² and kitchen 4.2 m², less for 1 or 2 peopleSame

Fire separation in a newer house

In a newer house the rating between units is 45 minutes, or 1 hour where a unit has two or more storeys, basement included. The 15.9 mm Type X option is 5/8" fire-resistant drywall, installed as a continuous smoke-tight layer; beams, posts and walls holding up the floor between the units get it too (9.10.8.3, 9.10.9.16).

Room sizes

Room sizes have no older-house alternative. Built-in cabinets lower each bedroom minimum by 1 m², and a suite that sleeps one or two people needs less (9.5.3A to 9.5.3E):

  • An 11 m² living area where it shares a room with the kitchen and dining space
  • A 3.7 m² kitchen
  • For a bachelor, 13.5 m² in all
A finished basement with a bathroom and a laundry room opening off a large room
A bathroom and laundry off the main room; in a suite, the exit and the heating decide most layouts.

The way out

Under Part 9, the suite's way out may not pass through the other unit or a service room such as the furnace room, though the two units may share an exit stair or hall that is separated from both (Div. B, 9.9.7.5, 9.9.9.3 and 9.10.9.16). In a house at least five years old, any one of these is accepted instead (Table 11.5.1.1.-C, C136 and C139):

  • Its own door straight outside, sliding doors included, with reasonable access to ground level and smoke alarms in both units.
  • A shared exit, such as a stair to a side door, enclosed by a 30-minute fire separation and reached without passing through either unit or the furnace room, with interconnected smoke alarms in both units and the common areas.
  • A route through the other unit, if the suite also has an escape window that opens without tools: 0.38 m² clear with no side under 460 mm, a sill within 900 mm of the floor and 1 m of the ground outside, 1 m clear in a window well, and interconnected alarms.
  • A route through the other unit in a sprinklered house, with smoke alarms in both units.

Bedrooms add one more rule: each floor level with a bedroom needs an escape window sized as in the table, with 550 mm clear in front if it sits in a window well, unless a door on that level leads straight outside (9.9.10.1). A new door to the outside often settles both rules; a below-grade one is drawn to the City's basement entrance guide.

A narrow concrete path between the side wall of a stucco house and a hedge, past a side door
A path to a side door; a suite's own door straight outside is one accepted way out.
A finished basement room with a small window set high in the wall
A small, high basement window; an escape window needs 0.35 m², with no side under 380 mm.

Alarms and heating

Smoke alarms go on every storey, in and outside every bedroom and in any shared hall, stair or other common space; one sounding sets off all of them in both units, and wireless links are accepted (9.10.19).

CO alarms go beside each bedroom, and on each storey without one, where the suite meets any one of these:

  • It has a fuel-burning appliance or flue.
  • It shares a wall, floor or ceiling with one, or with a garage.
  • It is heated by a fuel-fired furnace.

A bedroom that adjoins a garage or a fuel-burning appliance outside the suite, such as the furnace, gets one inside, and so does a furnace room outside both units (9.32.3.9A, 9.32.3.9B).

Fire Code rules for an existing two-unit house

The Ontario Fire Code governs buildings in use. Its Section 9.8 sets the minimum fire safety for a detached, semi-detached or row house with two units, up to 3 storeys and 600 m² in building area, where one unit sits above the other or two units side by side share an inside escape route. It does not apply where the house satisfies the Building Code's fire safety requirements, as a suite built and inspected under a building permit should (Fire Code, Div. B, 9.1.2.2 and 9.8.1.1).

  • Separation and alarms: a 30-minute fire separation around each unit, or 15 minutes with interconnected smoke alarms wired with no disconnect switch, and at least one smoke alarm on every storey of each unit; ducts need no fire dampers (9.8.2.2, 9.8.2.5, 9.8.4).
  • A way out: the unit's own door straight outside with direct access to ground level; or a shared route in a 30-minute enclosure that leads straight outside without entering the other unit; or a route through the other unit plus an escape window sized as in the older-house list above, with interconnected alarms (9.8.3).
  • Existing work: lath and plaster or gypsum board walls and ceilings count as 30 minutes, plasterboard with a plaster skim coat as 15, and 45 mm solid-core wood, hollow metal or kalamein doors with self-closers in hollow metal or solid wood frames are accepted, but only if they were in place on July 14, 1994; newer work has to show its rating under the 1994 Building Code's rules. A house sprinklered to NFPA 13D keeps its separations and escape routes from that date as they are (9.8.1.2, 9.8.2, 9.8.3.5).
  • Electrical: the fire department may order an Electrical Safety Authority inspection at the owner's cost, with hazards repaired by a licensed electrical contractor (9.8.6).

CO alarms come from the Fire Code's Section 2.16, unless they were installed to the Building Code as it read on or after January 1, 2025. Since January 1, 2026, a suite heated by a fuel-burning furnace outside it needs them too, and every suite that needs them has one next to each sleeping area and on every storey. In a rental, the landlord is responsible.

Legalizing an existing basement apartment vs. building a new one

The permit is the same either way, and the Building Code Act forbids the work without one (s. 8(1)). For an existing unit, the drawings show the basement as it is and what changes, and the rules above apply in full, compliance alternatives included. The difference is what the inspector can see; inspections happen at set stages:

  1. 01Structural framing, with the plumbing and HVAC rough-ins
  2. 02Fire separations, before any finishes
  3. 03Insulation and vapour barrier
  4. 04The finals

Toronto Building requires any element covered before its inspection to be uncovered, so in a finished unit expect to open ceilings and walls where the separation, ducts and pipes run.

If the unit is rented, the application's Rental Renovation Licence Screening Form shows whether the City's rental renovation licence (Municipal Code Chapter 662) also applies.

The building permit and inspections

  1. 01
    Drawings and forms

    Once the suite is designed: a site plan on your survey with a zoning summary, floor plans with every alarm and plumbing fixture, sections with ceiling heights and stairs, and construction details. The City's forms and a Plumbing Data Sheet go in with them, all as PDFs, and HVAC work adds what the City's Residential Mechanical (HVAC) Guide asks for.

  2. 02
    City fees

    Toronto Building's 2026 rates are $11.53 per m² of altered floor area plus $56.33 for the new unit, with a $214.79 minimum: a 60 m² suite is $748.13. Underpinning adds $12.37 per linear metre. Plumbing and HVAC permits filed with the building permit add no fee for work inside the house. No permit issues until the fees are paid.

  3. 03
    City review

    A one-to-two-unit conversion qualifies for Toronto Building's Express Services, whose goal is a review within 3 business days of intake, as long as no permit for a new house or an addition is active.

  4. 04
    Inspections

    Book each mandatory inspection as the work reaches it, with a full-size colour print of the permit drawings on site. The permit fee covers them.

  5. 05
    Close the permit

    Book the final inspection to close the permit; Toronto Building warns that an open permit can complicate a future sale. Electrical work is reported to the Electrical Safety Authority separately from the building permit, and ESA issues a Certificate of Acceptance once it passes.

How to start a basement apartment

Start with the basement as it stands:

  • Measure the clear heights, as above.
  • Photograph the stair, the furnace room and every window.
  • Photograph the outside wall where a door could go.
  • Find your survey.
An older basement with painted block walls, a low plank ceiling and a small window
An older, low basement: measure and photograph it before any design.

Those few facts decide the design: whether the floor comes down, which rooms sit against windows that can be enlarged, where the kitchen and bathroom meet the drain, how the suite gets outside and whether the furnace stays shared. Design the suite first, then draw the permit set from that design, so the examiner reviews a home that already works.

Questions people ask

01Is a basement apartment legal if it passed a fire inspection?

Not on its own. A fire inspection checks the Fire Code's minimums for a house people already live in. A unit built today also needs zoning permission and a building permit that has been inspected and closed.

02Does every bedroom in a basement apartment need an egress window?

Not one per bedroom. The Building Code asks for at least one escape window on each floor level with a bedroom, opening without tools to 0.35 m² with no side under 380 mm, unless a door on that level leads straight outside. Each bedroom still needs glass equal to 5% of its floor area for light, or half that in an older house where the window isn't an escape route.

03Can a basement apartment share the furnace with the main house?

Yes, in a house at least five years old, if every unit has smoke alarms and a duct smoke detector shuts the furnace off when it trips. In a newer house the units can't share ductwork, so a furnace's ducts can serve only one unit; one boiler with radiant heat can still serve both.

04Do I need soundproofing between the main floor and the basement apartment?

Yes. A new house needs separating assemblies rated STC 50, or ASTC 47 counting the surrounding construction. An older house may use STC 43, ASTC 40 or the Code's set assembly: 150 mm of insulation in the joists, insulated studs, resilient channel on one side and 12.7 mm drywall.

Sources

  1. 01Zoning By-law 569-2013, Chapter 150.10 Secondary Suite (opens in a new tab)
  2. 02Zoning By-law 569-2013, Chapter 800 Definitions (opens in a new tab)
  3. 03Zoning By-law 569-2013, Chapter 200 Parking Space Regulations (opens in a new tab)
  4. 04City of Toronto: Multiplex Housing (opens in a new tab)
  5. 05City of Toronto: Considerations When Building Multiplexes (opens in a new tab)
  6. 06Planning Act, R.S.O. 1990, c. P.13, s. 76 (e-Laws) (opens in a new tab)
  7. 07Government of Ontario: The 2024 Ontario Building Code (archived page; in effect January 1, 2025) (opens in a new tab)
  8. 082024 Building Code Compendium, Div. B, Part 9 (Articles 9.5.3.1, 9.5.3A to 9.5.3E, 9.7.2.3, 9.9.7.5, 9.9.9.3, 9.9.10.1, 9.10.8.3, 9.10.9.16, 9.10.10.3, 9.10.10.4, 9.10.13, 9.10.19, 9.11.1.1, 9.32.3.9A to 9.32.3.9C, 9.33.1.1, 9.33.4.3 and 9.33.6.13) (opens in a new tab)
  9. 092024 Building Code Compendium, Div. B, Part 11 (Articles 11.4.2.3, 11.4.3.4 and 11.5.1.1, Table 11.5.1.1.-C) (opens in a new tab)
  10. 102024 Building Code Compendium, Div. A, Articles 1.3.3.3B and 1.4.1.2 (opens in a new tab)
  11. 112024 Building Code Compendium, Appendix A, Note A-9.32.1.2.(2) (separate ventilation) (opens in a new tab)
  12. 12Toronto Municipal Code Chapter 629, Property Standards (opens in a new tab)
  13. 13Toronto Building: Residential Underpinning permit guide (opens in a new tab)
  14. 14Toronto Building: Residential Basement Entrances permit guide (opens in a new tab)
  15. 15Fire Code, O. Reg. 213/07, Div. B, Article 9.1.2.2, Section 9.8 and Section 2.16 (e-Laws) (opens in a new tab)
  16. 16O. Reg. 87/25 amending the Fire Code, s. 79, in force January 1, 2026 (e-Laws) (opens in a new tab)
  17. 17Toronto Fire Services: carbon monoxide alarm rules (January 1, 2026) (opens in a new tab)
  18. 18Building Code Act, 1992, s. 8(1) (e-Laws) (opens in a new tab)
  19. 19Toronto Building: Secondary Suites permit guide (opens in a new tab)
  20. 20Toronto Building: building permit fees (effective January 1, 2026) (opens in a new tab)
  21. 21Toronto Building: Related Plumbing & Drain Permits (opens in a new tab)
  22. 22Toronto Building: Related Mechanical (HVAC) Permit (opens in a new tab)
  23. 23Toronto Building: Building Permit Review Streams (opens in a new tab)
  24. 24Toronto Building: About Building Inspections (opens in a new tab)
  25. 25Toronto Building: When to Call for Inspection of Small Buildings (opens in a new tab)
  26. 26Toronto Building: Working Without a Permit (opens in a new tab)
  27. 27Electrical Safety Authority: Notifications and Inspections (opens in a new tab)

Rules and fees change. We verify them on every project before drawings start.

Rocco Schipano
Written by Rocco Schipano
Principal, Architalcan Design Inc. BCIN 25897 – 41741. 20+ years of Toronto design and permits.

Tell us about the project. We'll tell you what it needs.

Send the address, and email or WhatsApp the survey if you have one. You'll get a straight answer on zoning, the drawings you need and a quote.