How many units can your Toronto lot have?
Every residential zone allows a houseplex of up to four units; five or six are allowed only in nine wards. The zoning calls a multiplex a houseplex: one building on one lot with up to four units, at least one wholly or partly above another.
- units in a houseplex in any R, RD, RS, RT or RM zone
- 4
- units in a detached houseplex in nine wards
- 6
- height, with no storey or floor space index limit
- 10.0 m
- bedrooms at most in a fourplex
- 12
| Lot or building | Units |
|---|---|
| Any R, RD, RS, RT or RM zone | 4 |
| Wards 4, 9, 10, 11, 12, 13, 14, 19 and 23 | 6 |
| Half a semi, or one townhouse | 4 |
A fiveplex is not a separate permission: By-law 654-2025 allows “a detached houseplex with five or six dwelling units” in one rule. The building must be detached, on one lot, with a unit above another, and no part of a semi or townhouse can become a fiveplex or sixplex. In those wards, a “u” limit under 6 in the zone label rises to 6.


Three things that can change the count
- A site-specific exception (the “x” number in a zone label) can bind a houseplex to the exception's rules for a detached house. The zone's houseplex rules override it only for some limits, such as height and floor area, where they are more generous, so the exception's setbacks still apply.
- A former municipality's by-law: some lots are still zoned under one.
- Other routes to more units, with limits of their own, in R and RM zones and on lots on a major street: an apartment building where the zone label allows one, or, in the R zone, a house or half a semi built before December 15, 2023, converted to more units inside its walls (10.10.20.41).
The zoning limits that shape a multiplex
Height, main walls, depth, setbacks and lot coverage set the outline; a bedroom cap limits the units inside.
Height and main walls
- Height: 10.0 m, or the Height Overlay Map figure if higher, with no storey or floor space index limit (the “d” number).
- Five or six units may reach 10.5 m if the lowest level holds a unit, with ceilings of 2.4 m or more and ceiling joists 1.0 to 1.5 m above established grade over at least 80% of that level.
- Main walls (R, RD and RS zones): with a 10.0 m height limit, they stop at 7.5 m (2.5 m below the limit) along at least 70% of the side walls or 40% to 60% of the front and rear walls. A flat-roofed top storey stepped back at least 1.4 m at the front and rear can rise above that.

Depth, setbacks and lot coverage
| Zone or lot | Depth limit |
|---|---|
| R zones | 17.0 m from the required front yard setback |
| RS and most RD zones | 17.0 m of building length, with the rear wall within 19.0 m of that setback |
| A deep lot: at least 36 m deep with under 10 m of frontage, or 40 m with 10 m or more | 19.0 m |
| RM and RT zones | No length or depth limit for a houseplex |
- Setbacks: as for a house in your zone, such as an RD rear yard of 7.5 m or 25% of the lot depth, whichever is more.
- Lot coverage: where the Lot Coverage Overlay Map shows under 45%, a houseplex lot may cover 45% (RD, RS, RT and RM zones).
Entrances, balconies and parking
- Entrances: more than one front entrance is allowed.
- Balconies: in RD and RS zones, each unit may have up to two balconies or decks at the second storey or above, one at the front and one at the rear (on a corner lot, one may face the side street).
- Parking: none required, car or bicycle. The zoning's bicycle rates for homes apply only to apartment and mixed-use buildings, and bicycle spaces follow only if you choose to provide five or more car spaces.
Converting your house or building new
A conversion keeps what the house has; anything added outside must meet today's zoning.

If every new unit fits inside the building as it stood the day before the permit is issued, the house keeps its lawful status, setbacks included, even where today's rules ask for more (10.5.20.40). Five or six units follow the same rule, in a detached house only.

Anything added outside is an addition and must meet today's zoning or get a minor variance.

A new building meets the current Building Code throughout.
Two breaks for narrower lots (10.5.40.71):
- On a lot 12.2 m (40 ft) wide or less, an addition built straight up over the existing walls keeps the house's existing setbacks.
- A rear or side addition keeps the existing side yards on a lot under 9.0 m wide; from 9.0 m to 12.2 m, it keeps half the required side yard, or the existing one if greater.
Additions of 100 m² or more, or a demolition, also bring the Residential Infill Public Notice.
The Building Code for a conversion
A house that has stood five years or more is renovated under Part 11 of the Ontario Building Code, whose compliance alternatives can replace Part 9 rules. Among them:
- Separations between units can be 30 minutes instead of 45.
- In a building of up to four units, one existing furnace can serve them all, with smoke alarms in each unit and a duct smoke detector that shuts it off (C156, C205).
What the Building Code adds from three units
From three units, the building is a multi-unit Part 9 building, provided it has no more than three storeys and 600 m² of building area (its footprint). The Code treats two units in one house as a “house with a secondary suite”, with lighter rules.
From three units: fire separations, a second exit, engineers
- Fire separations: in a new building, 45 minutes between units, and 1 hour around a unit on two levels, basement included, with none of the Type X drywall or sprinkler shortcuts a two-unit house can use (9.10.9.16); a converted house can use 30 minutes (C156).
- A second exit: a unit whose door opens onto a stair shared with other units, or onto a shared corridor with a single exit, needs a second, separate way out (9.9.9.3). This rule decides where the stairs go.
- Structure, HVAC and plumbing: an engineer, or a designer registered for that work, designs them, since the building is no longer a “house” (Div. C, Table 3.5.2.1); the City also wants plumbing drawings for each floor.
From four units: barrier-free design
In a new building, barrier-free design applies, since the Code exempts houses, duplexes, triplexes and townhouses, not fourplexes. Plan barrier-free entrances and a path through the entrance storey; other floors are exempt at this size (3.8.1.1, 3.8.1.2, 3.8.2.1). A converted house needs only some of these features (11.3.3.2).
Five or six units: a fire alarm
If more than four units share one exit stair or corridor, a fire alarm system is required once the building sleeps more than 10 people (the Code counts two per bedroom) or has over three storeys counting the basement, unless each unit has its own exterior exit to the ground (9.9.1.3, 9.10.18.2).

Does a multiplex need an architect?
Under Ontario's Architects Act, a multiplex needs no architect at three storeys or fewer and 600 m² or less of gross area. Gross area is every floor above grade, measured to the outside of the walls, so most basements don't count (s. 11(3)(a), 11(6)).
| Building | Who can design it |
|---|---|
| Three storeys or fewer, 600 m² or less | A BCIN-registered designer in the right classes |
| Over 600 m² | Only an architect |
| Over three storeys | An architect and an engineer (s. 11(4)) |
The Act's separate exemption for houses of up to three storeys never covers stacked units (s. 11(3)(b)).
Adding a garden or laneway suite
A fourplex lot can hold five homes. The City says a garden suite or laneway suite can share a lot with a multiplex if it meets its own rules, and the zoning allows one per lot, garden or laneway, not both (150.7.20.1).
With a fiveplex or sixplex
For five or six units, we read it as six plus one, and confirm it for your lot at the zoning review. The City's multiplex pages don't say so outright, but:
- Nothing in the garden suite chapter limits the units in the main building.
- City Planning's 2025 garden suite report counts up to seven units on a lot where sixplexes are allowed.
- The parkland rules count a suite as a seventh unit beside six (Municipal Code § 415-30 A(16)).
The suite's own limits
- Floor area: 120 m², or 60 m² if it is one storey, and less than the multiplex.
- Distance from the multiplex: 4.0 m, or 7.5 m if the suite is taller than 4.0 m.
- Rear lot line: at least 1.5 m away.
- Parking: two bicycle spaces and no parking.
The two buildings share the yard: every metre of multiplex depth comes out of the suite's space. Firefighters need a path from the street to the suite door, 1.0 m wide (0.9 m with sprinklers) and up to 45 m long, or 90 m with added fire-safety measures. So a 0.9 m side yard is wide enough only for a sprinklered suite's path.


Asking for more with a minor variance
When a design doesn't fit, the Committee of Adjustment can grant a minor variance. It can cover:
- a little more depth
- a narrower side yard
- more bedrooms
- more units than your area allows, such as a fifth unit outside the nine wards, though five units there make an apartment building in the zoning's terms, which may need a rezoning instead
That is possible, never guaranteed: each application is decided on its own facts, after public notice, against the Planning Act's tests (s. 45(1)).
A provincial rule that may make a variance unnecessary
A minimum setback on urban residential land is deemed to be 90% of the by-law's figure, so a 7.5 m rear yard can be 6.75 m as of right (Planning Act s. 34(1.4); O. Reg. 545/06). It doesn't apply:
- in the Greenbelt
- within 300 m of most rail lines
- within 120 m of a river or stream valley, an inland lake, a wetland or the Lake Ontario shoreline
City fees and charges in 2026
These are the City's 2026 figures. Our design fee is separate and quoted in writing.
| Charge | Amount |
|---|---|
| Zoning certificate: converting or adding to a house | $644.38 |
| Zoning certificate: new building of 3+ units, up to 300 m² | $888.14 |
| Zoning certificate: new building of 3+ units, over 300 m² | $1,863.82 |
| Permit: new floor area | $18.56/m² |
| Permit: interior alterations | $11.53/m² |
| Permit: each new unit | $56.33 |
| Minor variance, up to 3 units | $2,228.98–$5,011.08 |
| Minor variance, 4 or more units | $6,485.59 |
| Development charges, units 2 to 6 | $0 |
| Parkland, units 2 to 6 (lot of up to 6, or 7 with a suite) | Exempt |
The permit minimum is $214.79, and the zoning certificate fee is credited to the permit when you apply with the certificate.
How to start
Before the zoning review, gather:
- The zone label and any exception, from the City's zoning map
- The height, lot coverage and sixplex overlays, from the same map
- The lot's frontage and depth and the existing setbacks, from a survey
- 01Design the units
Test layouts against height, depth, bedrooms, exits and barrier-free entrances, and decide whether to convert, add or rebuild.
- 02Zoning certificate, then any variance
Apply for a Zoning Applicable Law Certificate (up to three reviews); without one, Toronto Building treats a permit application as incomplete. What doesn't fit goes to the Committee of Adjustment.
- 03Permit drawings and forms
Site plan, floor plans, sections and details, with structural, HVAC and plumbing drawings by an engineer or a designer registered for that work; a Schedule 1 from each BCIN-registered designer, the Tree Declaration and the Rental Renovation Licence Screening Form.
- 04Submit and answer the examiner
File online. Toronto Building reviews a complete application for three or more units within 15 business days and a new duplex within 10, and aims to review a house converted to two units within 3. The plumbing and HVAC permits can follow.
With your survey, we read the zoning, test the unit count and layout, and design the multiplex units with you. An engineer or a designer registered for that work designs the structure, HVAC and plumbing, and we coordinate their sheets with ours in one permit set.
Our ready-made multiplex layouts for common lot sizes can be a head start: our own designs, not City-approved plans, and each still needs its own zoning review and permit.

Questions people ask
01Can I build a fiveplex in Toronto?
As a houseplex, only in wards 4, 9, 10, 11, 12, 13, 14, 19 and 23, in a detached building on one lot. Elsewhere a houseplex stops at four. A fifth unit there needs a minor variance or a rezoning, unless the lot allows an apartment building (some R and RM zones, and lots on a major street) or it is an R-zone house built before December 15, 2023, converted inside its walls.
02How many bedrooms can a fourplex have in Toronto?
Twelve: from three units, the zoning allows three times as many bedrooms as units, counting a bachelor as one; a duplex may have eight. A lawfully existing building keeps the bedrooms it has, as long as none are added.
03Does a fourplex need an architect in Ontario?
Only over three storeys or 600 m² of gross area, counting every floor above grade. Within both limits a BCIN-registered designer can design it, with the structure, HVAC and plumbing by an engineer or a designer registered for that work; over three storeys, it takes an architect and an engineer.
04Are there development charges on a Toronto multiplex?
Not on units two to six while the lot has six units or fewer: the Municipal Code exempts the second to fourth and sets the fifth and sixth at $0. Those units also pay no parkland charge, on a lot of up to six units, or seven where one is a garden or laneway suite.
05Does Toronto have free fourplex plans?
Yes: pre-approved fourplex and sixplex plans, in narrow and wide versions, free from the City. A qualified designer still takes responsibility for each, the placement on your lot is still reviewed, and any change, even to the heating or plumbing, ends their pre-approved status.
Sources
- 01City of Toronto: Multiplex Housing (opens in a new tab)
- 02City of Toronto: Considerations When Building Multiplexes (opens in a new tab)
- 03By-law 654-2025 (fiveplexes and sixplexes, Section 600.60) (opens in a new tab)
- 04By-law 648-2025 (detached houseplexes: height, depth, bedrooms) (opens in a new tab)
- 05City of Toronto: About Your Local Government (community council wards) (opens in a new tab)
- 06Zoning By-law 569-2013, Chapter 10 Residential (ss. 10.5.20.40 and 10.5.40.71) (opens in a new tab)
- 07Zoning By-law 569-2013, Chapter 10.10 Residential Zone (R) (opens in a new tab)
- 08Zoning By-law 569-2013, Chapter 10.20 Residential Detached Zone (RD) (opens in a new tab)
- 09Zoning By-law 569-2013, Chapter 10.40 Residential Semi-Detached Zone (RS) (opens in a new tab)
- 10Zoning By-law 569-2013, Chapter 10.60 Residential Townhouse Zone (RT) (opens in a new tab)
- 11Zoning By-law 569-2013, Chapter 10.80 Residential Multiple Zone (RM) (opens in a new tab)
- 12Zoning By-law 569-2013, Chapter 800 Definitions (apartment building, detached houseplex, established grade) (opens in a new tab)
- 13Zoning By-law 569-2013, Chapter 200 Parking Space Regulations (Table 200.5.10.1) (opens in a new tab)
- 14Zoning By-law 569-2013, Chapter 230 Bicycle Parking Space Regulations (230.5.10.1(5) and (7)) (opens in a new tab)
- 15City Planning: Multiplex Study Final Report (April 13, 2023) (opens in a new tab)
- 16Toronto Building: Multiplex Conversion permit guide (opens in a new tab)
- 172024 Building Code Compendium, Div. A, Articles 1.3.3.3, 1.3.3.3B and 1.4.1.2 (opens in a new tab)
- 182024 Building Code Compendium, Div. B, Part 9 (Articles 9.5.2.1, 9.9.1.3, 9.9.9.3, 9.10.9.16 and 9.10.18.2) (opens in a new tab)
- 192024 Building Code Compendium, Div. B, Section 3.8 (Articles 3.8.1.1, 3.8.1.2 and 3.8.2.1) (opens in a new tab)
- 202024 Building Code Compendium, Appendix A, Note A-3.8.2.1.(5) (barrier-free apartments) (opens in a new tab)
- 212024 Building Code Compendium, Div. B, Part 11 (Articles 11.3.3.2 and 11.5.1.1, Table 11.5.1.1.-C, C156 and C205) (opens in a new tab)
- 222024 Building Code Compendium, Div. C, Table 3.5.2.1 (designer classes) (opens in a new tab)
- 23Toronto Building: Building Permit Review Streams (opens in a new tab)
- 24Architects Act, R.S.O. 1990, c. A.26, s. 11 (e-Laws) (opens in a new tab)
- 25Zoning By-law 569-2013, Chapter 150.7 Garden Suites (opens in a new tab)
- 26City Planning: Garden Suites Monitoring Program, Final Report (June 27, 2025) (opens in a new tab)
- 27Toronto Building: Providing Fire Department Access to a New Garden Suite (opens in a new tab)
- 28Planning Act, R.S.O. 1990, c. P.13, ss. 34(1.4), 34(1.5) and 45(1) (e-Laws) (opens in a new tab)
- 29O. Reg. 545/06, s. 1.1: setbacks deemed at 90 per cent (e-Laws) (opens in a new tab)
- 30O. Reg. 254/23: areas near railways, shorelines and valleys (e-Laws) (opens in a new tab)
- 31Toronto Building: Zoning Applicable Law Certificate (2026 fees) (opens in a new tab)
- 32Toronto Building: building permit fees (effective January 1, 2026) (opens in a new tab)
- 33Committee of Adjustment: forms, submission guidelines and fees (2026) (opens in a new tab)
- 34Toronto Municipal Code Chapter 415, §§ 415-6 A and 415-30 A (consolidated July 30, 2026) (opens in a new tab)
- 35By-law 845-2025 (development charges for units five and six set at $0) (opens in a new tab)
- 36By-law 269-2026 (parkland exemption, § 415-30 A(16) corrected) (opens in a new tab)
- 37City of Toronto: Garden Suites (opens in a new tab)
- 38Toronto Building: Residential Infill Public Notice (opens in a new tab)
- 39Toronto Building: Pre-Approved Multiplex Building Plans (opens in a new tab)
Rules and fees change. We verify them on every project before drawings start.